Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pitot Static Training First Line Maintenance. P/S Testing Precautions b b 1.Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious.

Similar presentations


Presentation on theme: "Pitot Static Training First Line Maintenance. P/S Testing Precautions b b 1.Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious."— Presentation transcript:

1 Pitot Static Training First Line Maintenance

2

3 P/S Testing Precautions b b 1.Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious way b b 2.Ensure static heat switch off if equipped and as above b b 3.Ensure drains are identified and ensure are in closed position, perhaps open drains and inspect for water b b 4.Fit pitot adapter to pitot head and tape off and flag drain holes b b Fit static adapter to side of a/c if fixture is available; with some a/c it is acceptable to tap into drain fitting. - Inspect static parts at this time for deformation / corrosion. Tape off and flag any unused static ports.


Download ppt "Pitot Static Training First Line Maintenance. P/S Testing Precautions b b 1.Ensure pitot-heat switch off and CCT bkr pulled and collared in obvious."

Similar presentations


Ads by Google