Download presentation
Presentation is loading. Please wait.
Published byBrianne Hardy Modified over 8 years ago
1
Community Development Department Waterstar (sm) Demonstration Project at Palm Coast Utility Office
2
Community Development Department Existing Partnerships St. Johns River Water Management District (SJRWMD) –Watershed Action Volunteers (WAV) 1.Annual Intracoastal Waterway Cleanup 2.Educational Outreach –Florida Water Star Demonstration and Retrofit Project 1.City of Palm Coast Utility Offices will be retrofitted and assessed for water conservation and savings 2.Irrigation, landscaping, pervious paver and rain garden exhibit
3
Community Development Department Waterstar Concepts Demonstrated Waterwise practices Three types of sod examples Low flow toilets and urinals in offices Rain barrel example plumbed to roof Pervious brick pavers Rain garden Waterwise plantings labeled Informational kiosks (2) Low volume irrigation on reuse water Interactive Irrigation controller station on kiosk
4
Community Development Department Florida Water Star Demonstration
5
Community Development Department Benefits of This Project Citizen education Low impact development techniques School children education “Poster child” for Waterstar Water conservation monitoring A more attractive place of business
6
Community Development Department Schedule for Construction Site preparation-currently underway Grading- Friday Sept. 3 rd Paver installation- Sat-Sun, Sept. 4,5 th Landscape/ irrigation- Sept. 6-13 th Kiosk and signage installation- Sept. 27 Project complete- Sept. 30 th
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.