Download presentation
Presentation is loading. Please wait.
Published byGeorgina Williams Modified over 9 years ago
1
Group 14671 Expansion Joint Active Monitoring
2
Team Members Joe Savino – Project Lead Mechanical Engineer Adam Remick – Customer Contact Electrical Engineer Andrew H – Title here Mechanical Engineer
3
Prior Project Test Rig for Garlock Expansion Joints Temperature Axial Displacement
4
Expansion Joints Bolted between pipes Rubber and Fabric Sizes 2’’ to 130’’ Multiple working fluids, Pressures, Temperatures Contraction, Expansion Torsion, Vibration
5
Benchmarking No system in the market Difficult to measure composite/rubber degradation Multiple reasons for degradation Current method is regular preventative maintenance Visual Inspection
6
Our Goal Deliverables Sensor package for EJ’s 4in and larger Compatible with former software project
7
Customer Requirements
8
Engineering Requirements
9
House of Quality
10
Project Schedule
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.