Download presentation
Presentation is loading. Please wait.
Published byLucinda Clarke Modified over 9 years ago
1
Leading by Example Philip Gates, CEM, CMVP, EIT Energy Manager 1
2
2 How to begin?
3
3 Municipal Facility Retrofits Energy Reporting Measurement & Verification Municipal Energy Design & Standards City-Wide Energy Codes and Policies
4
4 15,000,000 sqft of building area
5
5 Public Buildings: By the Numbers Total facility sites: 657 Owned & operated: 346
6
6 Utility accounts: 249 natural gas 2,125 electric 885 water 4 steam/CHW
7
7 7 year low -4% vs. 2012
8
8 Municipal Retrofits: Impact Projects completed/underway (5 years) Total Projects398 Total Facility Sites Improved180 Capital Investment $36,127,097 Avoided Cost, $/yr $4,219,509 Rebates Received$5,427,701 Simple Payback, years8.7 / 3.1 Electricity Savings, kWh/yr 58,227,372 Natural Gas Savings, CCF/yr69,095 Emissions Reductions tons C02e/yr24,263 lbs NOx/yr26,731 lbs VOCs/yr 596
9
9 Immed. 1yr 3yr 4yr 5yr 9yr 25yr Retro-Commissioning Low-$ system tune-ups 5 buildings, 3M sqft $316K annual savings PC Energy Mgmnt Software solution 6,500 devices $200K annual savings Pool Pump Control Stop over-circulating 24 Public Pools $70K annual savings LED Street Lighting Replace high wattage fixt. 25,000 fixtures $, kWh annually Chillers & DX Units Eff. equip. w/ control 40 buildings $154K annual savings Exterior Lighting Fluor., LED 108 sites $155 annual savings Interior Lighting Fluor., LED, control 135 sites $1.5M annual savings Window Film Reduce solar heat gain 39 buildings, 184Ksqft $289K annual savings
10
1. Continuously benchmark facility energy use 2. Prioritize facilities Heavy usage High public visibility 3. Conduct energy assessments 4. Self-manage retrofits, quick payback first 5. Measure & verify utility savings (avoided cost) 6. Revolve energy savings and rebates Comprehensively retrofit all facilities 10
11
Develop in-house expertise Train building operators; preventative maintenance Install control systems your staff can operate Exercise a robust compliance protocol Quality control and field verification is essential 11
12
Benchmark all buildings with significant energy use Measure & Verify utility savings (in-house) Large portfolio: whole building utility bill analysis, IPMVP Option C Follow life-cycle for capital-intensive upgrades Commission or functionally test every project Simple Solutions: Set points, operating hours, equip. right-sizing 12
13
13
14
Budget is war: Know thy CFO, budget director, & budget analyst Tell the full fiscal impact of your work: Reduced energy costs Accomplished deferred maintenance projects Reduced operation and maintenance costs Review bills monthly & know thy rate categories Exercise fiscal temperance with savings Incur no debt & always be cash-positive 14
15
Seed Funding Implement Retrofits Quantify Utility Savings Appropriate Savings & Rebates Energy Efficiency Fund $$ 15 General Fund
16
16 $3.6M $7.7M $6.0M
17
ENERGY STAR Portfolio Manager Noesis Energy’s M&V platform EVO measurement & verification guidelines SECO LoanSTAR revolving loan fund SECO QuickCalcs Spreadsheets DOE State and Local Energy Efficiency Action Network (SEE Action) DOE eQuest energy model 17
18
Philip Gates, CEM, CMVP, EIT Energy Manager (210) 207-1444 philip.gates@sanantonio.gov philip.gates@sanantonio.gov 18
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.