Download presentation
Presentation is loading. Please wait.
Published bySheryl Terry Modified over 9 years ago
1
Proposed Framework Contract for Capital Works Tenants Forum – 27 th July 2011
2
Workload Analysis - 1 Disabled Adaptations – DDA and DFG External Re-decorations Structural Major Repairs and Alterations Insurance (Fire/Flood etc)
3
Workload Analysis - 2 Elemental Improvements (Kitchens, Bathrooms and Wiring) Fire Safety White Goods (Laundry for Sheltered Schemes / Refuges) Entry Comms
4
Proposed Lots - 1 Four contractors per lot General Building projects (<£25k) General Building projects (£25k - £250k)* DDA bathroom adaptations DDA stair-lifts External redecorations
5
Proposed Lots - 2 One contractor per lot Fire safety White Goods (Sheltered schemes) Entry Comms
6
Provisional Timetable Leaseholder & tenant consultation: Jul/Aug 11 Issue PQQ: early Sep 11 Initial expressions of interest: Oct 11 Issue ITT: Late Oct 11 Bids returned and assessed: Jan 12 Delegated decision on award: Feb 12 2 nd stage leaseholder consultation: Mar 12 Contract commences: 1 Apr 12
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.