Download presentation
Presentation is loading. Please wait.
Published byDylan Hubbard Modified over 9 years ago
1
Michael Faden Technology Solution Professional - Datacenter 2012 R2
4
Task 1: Create host groups Task 2: Create logical networks Task 3: Create vm networks Task 4: Create IP pools
5
Tenant 2 Tenant 1 Management 1 st question: how do I provide isolation? Datacenter isolation – separation of infrastructure traffic as security boundar and for QOS Tenant isolation – keeping tenants from each other and protect the infrastructure LM, Cluster, Storage
7
Converged 10GbE each VMNVM1 10GbE each Storage Live Migration Cluster Manage Non-converged 1GbE 10GbE HBA/ 10GbE Storage Live Migration Cluster Manage VM1VMN Converged with RDMA VMNVM1 Storage/LM/Cluster Management RDMA 10GbE each 10GbE each
8
Task 1: Create Port Profile Task 2: Create Logical Switch Task 3: Create Physical Computer Profile
9
Task 1: Create IPMI Run As Account Task 2: Inject drivers into Windows PE Image Task 3: Run Hyper-V Bare Metal Deployment Task 3: Review Deployment
10
Bare-metal server WDS server VHD Drivers Host profile contoso Library server Hyper-V server OOB reboot Boot from PXE Download VHDInject drivers Authorize PXE boot Run generic command execution scripts and configure partitions Customize and domain join Enable Hyper-V Download WINPE Hyper-V server Host Group Hyper-V server Host Group VMM server Hyper-V server Host Group
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.