Download presentation
Presentation is loading. Please wait.
Published byLora Hodge Modified over 9 years ago
1
Bureau of Planning & Economic Development
2
WisDOT and freight: responsibilities and plans Freight Advisory Committee State Freight Plan 2
3
Assistance Transportation Economic Assistance Freight Rail Infrastructure Improvement Program Freight Rail Preservation Program Harbor Assistance Program Local Roads Program Activities Multimodal Freight Network Highway Maintenance, Freight Ops. & Permits Safety & Enforcement State Traffic Operations Center & Work Zones 3
4
50% project funding in exchange for new or retained jobs Can be used for rail, waterway, air, and roads Local let projects – reimbursement for costs incurred http://wisconsindot.gov/Pages/doing-bus/local-gov/astnce- pgms/aid/tea.aspx (Doing Business- Local Government- Other Aid) http://wisconsindot.gov/Pages/doing-bus/local-gov/astnce- pgms/aid/tea.aspx Contact Jesse (Jesse.patchak@dot.wi.gov or 608-266-9910)Jesse.patchak@dot.wi.gov 4
5
Provide input on policies, processes and projects that facilitate and enhance: Reliable, safe and efficient movement of freight - statewide, nationally and internationally. Project decision-making and delivery processes. Connectivity between the various modes of transportation. Connectivity between state and local transportation systems. Connectivity between private and public sectors. 5
6
The FAC is purely an advisory committee. FAC responsibilities include: Assisting WisDOT in the development of, and subsequent updating of, the state’s Freight Plan and other relevant state plans as appropriate. Providing feedback and advice to the Secretary’s Office and WisDOT Freight Policy Administrator’s Group on freight transportation policies, processes or programs. 6
7
http://wisconsindot.gov/Pages/doingbus/freight/fac.aspx 7
8
http://wisconsindot.gov/Pages/doing-bus/freight/fac.aspx (Doing Business – Freight – Freight Advisory Committee) http://wisconsindot.gov/Pages/doing-bus/freight/fac.aspx Background documents – inaugural meeting agenda Summary Report of inaugural meeting will be posted soon Contact Ken (kenneth.Brotheridge@dot.wi.gov or 608-266-9476)kenneth.Brotheridge@dot.wi.gov 8
9
Provide a vision for multimodal freight transportation. Position the state to be competitive in the global marketplace by ensuring critical connections to national freight systems remain, or become, more efficient. 9
10
Development will take approximately 24 months. The anticipated completion date is December 2016. Early phases of plan’s foundation are still underway. Data intensive chapters gathering, compiling, organizing and drafting Public Involvement Plan published for comment http://wisconsindot.gov/Pages/projects/sfp/default.aspx (Projects & Studies - State Freight Plan) http://wisconsindot.gov/Pages/projects/sfp/default.aspx 10
11
11
12
Ken Brotheridge Kenneth.brotheridge@dot.wi.gov Kenneth.brotheridge@dot.wi.gov 608-266-9476 Jesse Patchak Jesse.patchak@dot.wi.gov Jesse.patchak@dot.wi.gov 608-266-9910 12
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.