PROJECT PHASES ACT 380 1. Objective To provide an understanding of the design & construction process and the roles of the different participants in this.

Similar presentations


Presentation on theme: "PROJECT PHASES ACT 380 1. Objective To provide an understanding of the design & construction process and the roles of the different participants in this."— Presentation transcript:

1 PROJECT PHASES ACT 380 1

2 Objective To provide an understanding of the design & construction process and the roles of the different participants in this process 2

3 3

4 Project Conception PLANNING AND PRE- DESIGN O Activities Include: O Feasibility Studies O Programming O Budget Analysis O Diagramming O Site Analysis O Site Selection 4

5 DOCUMENTS PRODUCED DURING PLANNING & PRE-DESIGN O OWNER O Program, Budget, Schedule O A/E O Reports, Analyses, Recommendations 5

6 DESIGN PHASE O Schematic Design O Design Development 6

7 SCHEMATIC DESIGN O Develop Schematic Design including: O General scope O Scale O Relationships O Functions 7

8 SCHEMATIC DESIGN DOCUMENTS O OWNER O Surveys O Geotechnical Data 8

9 SCHEMATIC DESIGN DOCUMENTS O A/E O Schematic drawings O Sketches, Renderings, Diagrams O Conceptual drawings O Plans, Elevations, Sections O Preliminary Project Descriptions O Cost Projections 9

10 DESIGN DEVELOPMENT O Develop Design Including: O Constructability O Integration of systems O Materials O Details O Fix and describe size O Character 10

11 DESIGN DEVELOPMENT DOCUMENTS O Drawings O Plans, Elevations, Sections, Typical Details O Engineering O Design Criteria, Equipment O Outline Specifications O Revised Cost Projections 11

12 CONSTRUCTION DOCUMENTS (Final Design) O Detailed documents which describe the work O Used to get bids or negotiate contract --Become part of the contract 12

13 CONSTRUCTION DOCUMENTS O OWNER O Solicitation (Invitation to Bid) O Instructions for procurement (To Bidders) O Bid/Proposal forms O General Conditions O Supplementary Conditions 13

14 CONSTRUCTION DOCUMENTS O A/E O Detailed drawings O Plans, Elevations, Sections, Details, Schedules O SPECIFICATIONS O Bidding requirements O Revised cost projections 14

15 BIDDING/NEGOTIATING/PURCHASING PHASE O Contractors review bidding documents and determine how much they would charge to complete the work described O Can be competitive or negotiated 15

16 BIDDING PHASE O A/E O Addenda O Owner O Request for Proposal O Purchase Orders O Contractor O Bid O Bid Security 16

17 CONSTRUCTION PHASE O “THE WORK” described in contract documents is executed 17

18 CONSTRUCTION PHASE O PHASES OF CONSTRUCTION O Mobilization O Construction O Contract administration O Project closeout 18

19 CONSTRUCTION PHASE O OWNER O Payments to Contractor O A/E O Contract Documents Modifications O Reviews and approves submittals O Site observation O Reviews and certifies applications for payment O Inspection at substantial completion O Inspection at final completion 19

20 CONSTRUCTION PHASE O CONTRACTOR O Permits O Schedules O Shop Drawings O Certificates O Record Documents O Warranties O Maintenance & Operation Data 20

21 Facility Management O OWNER O Maintenance Records O A/E O Post-Occupancy Reports or Analysis O CONTRACTOR O Warranty Service O Records 21

22 22 See pg. 1.7 Fig. 1.5-B