Download presentation
Presentation is loading. Please wait.
Published byJessica Richards Modified over 9 years ago
1
UNC0376S – Increased Choice when applying for NTS Exit Capacity Transmission workgroup - 4 April 2013
2
2 Update UNC0376S introduced the following changes: July Application Window Capacity start date to be the 1 st of any month between October Y+4 and September Y+6 Ad-hoc Application Process to be extended out from Y+4 to Y+6 reduce the minimum threshold for application from 10GWh/day to 1GWh/day Gemini System Development fully tested and signed off Functionality available for the July 2013 Enduring Annual NTS Exit (Flat) Capacity Application Window
3
3 Screen-shot 1 Gemini menu path
4
4 1 st of any month instead of only an October start date. Screen-shot 2 – Capture Request
5
5 Screen-shot 3 – Add Request
6
6 Additional Information: Communicated to the April UK Link Committee meeting as a Class 1 modification. Any further queries contact: Email: capacityauctions@nationalgrid.comcapacityauctions@nationalgrid.com Telephone number: 01926 654057
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.