Download presentation
Presentation is loading. Please wait.
Published byTerence Ball Modified over 8 years ago
1
Uli Schäfer 1 JEM Status and plans Hardware -JEM1 -Status Firmware -Algorithms -Status Plans
2
Uli Schäfer 2 JEM1 16 x 6-channel de- serialisers : SCAN921260 on 4 Input daughter modules w. XC2V1500. G-link / Opto daughter module Jet and Sum Processors XC2V2000 (BF package). Configuration : SystemACE 88 pair VMEVME each 165 pins FIO 60 bit @ 80Mb/s TTCdec CAN System ACE 3 x 40 bit @ 40 Mb/s DES Input 2 B 1 A 0 V 60 40 Input 5 E 4 D 3 C Input 8 H 7 G 6 F Input -- 10 X 9 W DAQ/Timing/VME To JMM G G Jet R S T U Sum DAQ To SMM ROI Opto clock mirror
3
Uli Schäfer 3 JEM1 main board Components : Backplane and daughter connectors (TTC, input, G-link) Bus drivers (VME) and PECL line drivers/receivers Jet and Sum processors (BGA 1.28mm pitch) 2 CPLDs (VME / display) Front panel connectors/LEDs SystemACE configurator / flash chip CAN Voltage converters Production: One-stop Rohde & Schwarz Component procurement PCB production Adjustment of impedances Test protocols Assembly Visual inspection X-ray
4
Uli Schäfer 4 JEM1 H/W Status Input daughters: 8 PCBs made 1 assembled 3 to be assembled asap stand-alone test system set up by Andrey LVDS link tests successful BER 10e-14 (binary counter pattern w. f/w error detection Main board: 4 PCBs made assembly under way. Delayed due to component availability (voltage converters) G-link daughters: Design complete, PCB / assembly asap JTAG test adapters under design
5
Uli Schäfer 5 Algorithms (input / sum RTDP) Minor modifications (post RAL 11’03) to energy sum algorithm due to re-partitioning on JEM1. Receive energies 4η ×(8+3)φ × 2(e/h) : 88 channels total Synchronisation, parity, mask Generate jet elements E T =E e +E h (12 per input processor) Low threshold Saturate jet elements at 1 TeV and send to jet processor @ 80Mb/s, 5-bit wide From jet elements (E T ) calculate E X and E Y by multiplying cosφ, sinφ (accuracy: 10bit E T ×12-bit coefficient -> 12 bit,.25GeV resolution throughout) Threshold E T Pre-sum E X, E Y and E T, saturate at 4 TeV Send to sum processor @ 40Mb/s Final summation over 3 partial sums Quad-linear encoding of energies (8 bit, 4 TeV range, 1GeV resolution) Saturation (4TeV) Parity
6
Uli Schäfer 6 Firmware status For JEM1 some modifications were required, mainly in I/O stages (input synchronisation using DDR registers), block RAM, DLLs, hardware multipliers, clock mirror, FCAL handling, E X /E Y calculation on input processor, separate jet / sum processors, VME access. Change of channel count per input processor Complete re-write of the input processor. Coherent code for both JEM0 and JEM1 well debugged on JEM0. Partially tested on input module test adapter. Waiting for JEM1. New code for board control CPLD (VME) under way. Merging sum / ROC / control code will start soon.
7
Uli Schäfer 7 Plans JEM1 back from assembly next week (?) G-link daughter and further copies of input daughters available in April Production of (3) more main boards in May (1 week) Hope to have stable JEM1 f/w & s/w in ~1month Keep JEM0s up and running until a minimum of 2 JEM1s successfully operated.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.