Download presentation
Presentation is loading. Please wait.
Published bySamantha Simpson Modified over 9 years ago
1
The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze 2007 GPA Fall Conference
2
09/21/07 Presented by: Dale Hall, RLA, ASLA, AICP Director of Municipal Services Williams & Associates, PC 706-310-0400 dhall@gaplanning.com Teresa Deitz Consultant 678-227-0226 teresa.deitz@hotmail.com
3
09/21/07 Developer (Public Sector) Anxiety
4
09/21/07 Williams & Associates - Deitz Consulting Perception of Government?
5
09/21/07 Reality … Neither can exist without the other
6
09/21/07 Williams & Associates - Deitz Consulting Basic Steps to Development 1. Planning 2. Rezoning 3. Design 4. Permitting 5. Construction 6. Occupancy
7
09/21/07 Williams & Associates - Deitz Consulting 1. Planning Developer considering what to do … Utilizing Services of a Professional Consultant
8
09/21/07 Williams & Associates - Deitz Consulting 2. Rezoning Conceptual Approval from Governmental Jurisdiction Based on Preliminary Design
9
09/21/07 3. Design Consultant prepares drawings to Owners specifications Developers Push the Envelope!
10
09/21/07 Williams & Associates - Deitz Consulting 4. Permitting Site (Civil) Plan Reviews Building (Architectural) Plan Reviews
11
09/21/07 5. Construction Rubber Hits the Road – When Permits are issued Building the Project Making the Plans a reality
12
09/21/07 Williams & Associates - Deitz Consulting 6. Occupancy Building is Complete! If all construction meets requirements Issuance of a Certificate of Occupancy
13
09/21/07 Williams & Associates - Deitz Consulting Basic Types of Development Residential Commercial Industrial Mixed-Use Governmental/Institutional
14
09/21/07 Williams & Associates - Deitz Consulting Why so many sets of plans?
15
Site Plan Review … a left turn through the maze Permits Ribbon Cuttings Certificates
16
09/21/07 Williams & Associates - Deitz Consulting Typical Site Plan Reviews 1. Planning 2. Erosion & Sediment Control 3. Utilities 4. Roadway
17
09/21/07 Williams & Associates - Deitz Consulting 1. Planning Each Jurisdiction has different rules … Zoning Parking Internal Circulation Landscaping
18
09/21/07 Williams & Associates - Deitz Consulting A. Zoning Conformance to conditions of zoning Standards Set by Ordinance Any Overlay Issues Historic Districts Watershed Districts Floodplain Wetland Buffers
19
09/21/07 B. Parking Minimum Sizes in Ordinance Minimum Numbers Set by use
20
09/21/07 C. Internal Circulation Movement of goods, people, vehicles Typically minimum standards Parking Space length and width Minimum travel aisle width
21
09/21/07 Williams & Associates - Deitz Consulting D. Landscaping Buffers Planting Strips Tree Preservation Plans Minimum landscape area? Landscape Architect ’ s seal/signature required?
22
09/21/07 Williams & Associates - Deitz Consulting 2. Erosion & Sediment Control Who is the Issuing Authority? Stormwater Policy Handbook (Green Book) Guidelines on principles of stormwater management Not for Design (Blue Book)
23
09/21/07 Williams & Associates - Deitz Consulting 3. Utilities A. Water B. Sewer C. Stormwater Management
24
09/21/07 Williams & Associates - Deitz Consulting A. Water Is there a Well? EPD Regulated Development on Jurisdictional Water Local Authority has Standard Requirements/Details
25
09/21/07 Williams & Associates - Deitz Consulting B. Sewer Is this on Septic? Health Department Approvals Each County has specific Requirements Development on Jurisdictional Sewer Local Authority has Standard Requirements/Details
26
09/21/07 Williams & Associates - Deitz Consulting C. Stormwater Management Technical Handbook (Blue Book) Sets Guidelines for review of stormwater runoff Not for construction (Green Book) Addresses water quality and quantity issues
27
09/21/07 4. Roadway Who has jurisdiction? Site Access/Curb Cuts Site Distance Certification Requires Engineer Seal/Signature
28
09/21/07 Review Process Paperwork Checklists Notes Code issues Redlines Show exact issue Either can lead to more comments
29
09/21/07 Williams & Associates - Deitz Consulting What about the Fees? City Employee Salaries Consultant Review Fees Plus minimal % - administrative State Erosion Fees Costs Directly Related to reviews
30
09/21/07 Williams & Associates - Deitz Consulting What ’ s not included? Bonds Construction Soil & Erosion Landscape Sign Permits
31
Building Plan Review … a right turn through the maze Permits Ribbon Cuttings Certificates
32
09/21/07 Commercial Construction Codes Georgia State Minimum Standard Building Code 2006 International Building Code (IBC) Includes GA Amendments
33
09/21/07 Williams & Associates - Deitz Consulting Amendments: NFPA 101 Commonly known as “ Life Safety Code ” Pertains to: Occupancy classifications Means of egress Interior Finishes Sprinkler Systems
34
09/21/07 Williams & Associates - Deitz Consulting Where ’ s Your Permit?
35
09/21/07 Williams & Associates - Deitz Consulting Prior to issuance of Building Permit 1. State Fire Marshall Approvals 2. Site (Civil) Plans 3. Building Plan Issues 4. Life Safety Issues
36
09/21/07 Williams & Associates - Deitz Consulting 1. State Fire Marshall Criteria Typically Required for Fire Marshall Approval: Building height and size Building purpose or designated function Number of rooms, floors, and square footage depending on uses State, public or institutional uses Occupancy loads per type Food or alcohol service Licensure for operation
37
09/21/07 Williams & Associates - Deitz Consulting State Fire Marshall cont. Complete Code at: http://www.lexis-nexis.com/hottopics/gacode Contact Local Fire Marshall or Atlanta 404-655-2056
38
09/21/07 Once you get Set of Approved Fire Marshall Plans Your building permit may be just around the corner!
39
09/21/07 Williams & Associates - Deitz Consulting 2. Site (Civil) Plans Wall Heights Any wall over four feet (4 ’ ) requires Engineer ’ s Stamp Design by others? Temporary Sanitary Facilities Notations required
40
09/21/07 Williams & Associates - Deitz Consulting 3. Specific Notes for Building Plans Elevation Drawings Confirm Height Materials must conform to Local codes Floor Plans Check Dimensions How different are they from the Site Plan?
41
09/21/07 Williams & Associates - Deitz Consulting Specific Notes cont. Uses Should be listed Seating Occupancy? Conform to zoning? Code Summary Summarizes building basics Code to which Building was designed Occupancies (uses) Building Square Footages Parking Requirements
42
09/21/07 Williams & Associates - Deitz Consulting 4. Life-Safety Issues Means of egress Headroom Minimum Standards NFPA 101, 7.1.5 Travel Length for Exiting Varies depending on occupancy type Panic Hardware on Doors Is this noted NFPA 101, 7.2.1.7
43
09/21/07 Williams & Associates - Deitz Consulting Certificate of Occupancy Sprinkler Plans Due before issuance of CO Special Inspection Reports Insures various construction requirements are met Due before issuance of CO
44
09/21/07 Williams & Associates - Deitz Consulting Finally … Emerging Unscathed
45
09/21/07 Williams & Associates - Deitz Consulting Why do we do all this? Protect Health, Safety, and Welfare Sets expected development level
46
09/21/07 Williams & Associates - Deitz Consulting Key to Success Communication! Discuss expectations Have Clear Standards & Procedures Spoon Feed Each other
47
09/21/07 Questions? The ABC ’ s of the Development Review Process: Navigating the Bureaucratic Maze Dale Hall, RLA, ASLA, AICP Director of Municipal Services Williams & Associates, PC 706-310-0400 dhall@gaplanning.com Teresa Deitz Consultant 678-227-0226 teresa.deitz@hotmail.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.