Lincoln Heights Storm Drainage Improvement Project Armstrong Glen May 6, 2014 Beatties Ford Road Regional Library Existing Conditions Public Meeting Steven.

Similar presentations


Presentation on theme: "Lincoln Heights Storm Drainage Improvement Project Armstrong Glen May 6, 2014 Beatties Ford Road Regional Library Existing Conditions Public Meeting Steven."— Presentation transcript:

1 Lincoln Heights Storm Drainage Improvement Project Armstrong Glen May 6, 2014 Beatties Ford Road Regional Library Existing Conditions Public Meeting Steven McCraney – Project Manager Phone – 704-432-0967 Email – smccraney@charlottenc.gov

2 WELCOME AND INTRODUCTIONS Charlotte-Mecklenburg Storm Water Services (CMSWS) Staff Steven McCraney– Project Manager Phone: 704-432-0967 E-mail: smccraney@charlottenc.gov Doug Lozner– Watershed Area Manager Armstrong Glen Staff Josh Letourneau – Project Manager Russell Parker– Project Engineer Charlotte-Mecklenburg Storm Water Services (CMSWS) Staff Steven McCraney– Project Manager Phone: 704-432-0967 E-mail: smccraney@charlottenc.gov Doug Lozner– Watershed Area Manager Armstrong Glen Staff Josh Letourneau – Project Manager Russell Parker– Project Engineer Armstrong Glen

3 MEETING PURPOSE Provide a summary of the Existing Conditions analysis. Request input from property owners/residents on the Existing Conditions analysis results. Obtain additional information from property owners/residents on perceived drainage issues. Provide a summary of the Existing Conditions analysis. Request input from property owners/residents on the Existing Conditions analysis results. Obtain additional information from property owners/residents on perceived drainage issues.

4 MEETING AGENDA Project Selection and Citizen Involvement Existing Conditions Analysis Summary Future Project Milestones – Path Forward General Questions and Comments Project Selection and Citizen Involvement Existing Conditions Analysis Summary Future Project Milestones – Path Forward General Questions and Comments

5 Why was the Lincoln Heights area chosen? Requests for service from property owners 56 TOTAL REQUESTS REPORTED TO 311 IN THIS NEIGHBORHOOD Example Requests: Inadequate and Deteriorating Infrastructure Road Flooding First Floor & Crawl Space Flooding Old Culverts, Pipes, Inlets Sink Holes Erosion, Blockages in Streams Larger watershed-wide issues that cannot be managed by spot repairs or without potentially impacting downstream properties Requests for service from property owners 56 TOTAL REQUESTS REPORTED TO 311 IN THIS NEIGHBORHOOD Example Requests: Inadequate and Deteriorating Infrastructure Road Flooding First Floor & Crawl Space Flooding Old Culverts, Pipes, Inlets Sink Holes Erosion, Blockages in Streams Larger watershed-wide issues that cannot be managed by spot repairs or without potentially impacting downstream properties PROJECT SELECTION AND CITIZEN INVOLVEMENT

6 Presented by: Armstrong Glen, P.C. Civil Engineers LINCOLN HEIGHTS STORM DRAINAGE IMPROVEMENT PROJECT LINCOLN HEIGHTS STORM DRAINAGE IMPROVEMENT PROJECT Existing Conditions Analysis Results

7 EXISTING CONDITIONS RESULTS MAP Highlights undersized storm systems Highlights storm systems that are structurally deficient. (determined from pipe video) Summarizes 311 Requests filed by residents. Highlights undersized storm systems Highlights storm systems that are structurally deficient. (determined from pipe video) Summarizes 311 Requests filed by residents.

8 EXISTING CONDITIONS RESULTS MAP GILBERT ST. HOLLY ST. NEWLAND RD.

9 EXISTING CONDITIONS RESULTS MAP AUGUSTA ST. MADRID ST. CUSTER ST. LA SALLE ST. GARNETTE PL.

10 CATHERINE SIMMONS AVE. HAINES ST. IRMA ST. JENNINGS ST. NEWLAND RD. KENNESAW DR. LA SALLE ST.. ERIE ST. EXISTING CONDITIONS RESULTS MAP

11 NEWLAND RD.. ODESSA AVE. KENNESAW DR. JENNINGS ST. MADRID ST.

12 STORM DRAINAGE IMPROVEMENT PROJECT PHASES PLANNING (Typically 12 to 27 months) Existing Conditions Analysis – Finding the Problems (Current Phase) Alternative Analysis – Developing Alternative Improvements DESIGN (Typically 21 to 34 months) Designing the Improvements PERMITTING (Typically 9 months, but usually overlaps the design phase) EASEMENT ACQUISITION (Typically 12+ months) BID (Typically 5 to 6 months) CONSTRUCTION (From 1 to 2+ years) PLANNING (Typically 12 to 27 months) Existing Conditions Analysis – Finding the Problems (Current Phase) Alternative Analysis – Developing Alternative Improvements DESIGN (Typically 21 to 34 months) Designing the Improvements PERMITTING (Typically 9 months, but usually overlaps the design phase) EASEMENT ACQUISITION (Typically 12+ months) BID (Typically 5 to 6 months) CONSTRUCTION (From 1 to 2+ years)

13 PATH FOWARD Additional information obtained during this meeting will be considered and incorporated into the existing conditions analysis, where applicable. Alternatives will be evaluated, and a recommended alternative will be developed. Charlotte-Mecklenburg Storm Water Services will hold a second public meeting to present and obtain feedback on the recommended alternative. Additional information obtained during this meeting will be considered and incorporated into the existing conditions analysis, where applicable. Alternatives will be evaluated, and a recommended alternative will be developed. Charlotte-Mecklenburg Storm Water Services will hold a second public meeting to present and obtain feedback on the recommended alternative.

14 Questions? Thank you for coming to the meeting! Please remember to sign-in and fill out a customer service card. Thank you for coming to the meeting! Please remember to sign-in and fill out a customer service card.