Presentation is loading. Please wait.

Presentation is loading. Please wait.

11/1/20151 Document Title: IEEE 1900.5 WG Status as of 26 March 2015 - Closing Document Date: 26 March 2015 Document No: 5-15-0023-00-mmat Author’s NameAffiliationAddressPhoneemail.

Similar presentations


Presentation on theme: "11/1/20151 Document Title: IEEE 1900.5 WG Status as of 26 March 2015 - Closing Document Date: 26 March 2015 Document No: 5-15-0023-00-mmat Author’s NameAffiliationAddressPhoneemail."— Presentation transcript:

1 11/1/20151 Document Title: IEEE 1900.5 WG Status as of 26 March 2015 - Closing Document Date: 26 March 2015 Document No: 5-15-0023-00-mmat Author’s NameAffiliationAddressPhoneemail Matthew ShermanBAE SystemsWayne, NJ973-229-9520matthew.sherman@baesystems.com Notice: This document has been prepared to assist IEEE DySPAN-SC and its Working Groups. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in6 form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE DySPAN-SC. Patent Policy and Procedures: The contributor is familiar with the IEEE Patent Policy and Procedures including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to IEEE DySPAN-SC and its Working Groups of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within the IEEE DySPAN-SC Committee. If you have questions, contact the IEEE Patent Committee Administrator at.matthew.sherman@baesystems.compatcom@ieee.org IEEE 1900.5 Contribution Doc #: 5-15-0023-00-mmat

2 WG Details 11/1/2015Doc #: 5-15-0023-00-mmat2 Working Group DesignationIEEE 1900.5 Working Group Name Working Group (WG) on Policy Language and Architectures for Managing Cognitive Radio for Dynamic Spectrum Access Applications Working Group Chair Provide name and e-mail address Matthew Sherman Matthew.sherman@baesytems.com Working Group Vice-Chair Provide name and e-mail address Darcy Swain-Walsh dswain@mitre.org Other Working Group Officers Provide name, position, and e-mail address Carlos Caicedo, Secretary ccaicedo@syr.edu Administrative contact Provide name and e-mail address Jonathan Goldberg goldberg.j@ieee.org Active PARs PAR NumberPAR TitlePlanned Completion 1900.5.1 (Exp. 12/31/15) Standard Policy Language for Dynamic Spectrum Access Systems June 2016 (PAR Extension required) 1900.5.2 (Exp. 12/31/17) Method for Modeling Spectrum ConsumptionSeptember 2015

3 Current Membership 11/1/2015Doc #: 5-15-0023-00-mmat3 CountWG Status First NameLast NameAffiliation 14Total 1MemberCarlosCaicedoSyracuse University (Secretary) 2MemberDavidChesterHarris 3MemberMitchKokarNortheastern University 4MemberVPrasadWireless and Mobile Communication, TU Delft 5MemberSamSchmitzMitre 6MemberMatShermanBAE Systems (Chair) 7MemberJohnStineMitre 8MemberDarcySwainMitre (Vice Chair) 9MemberTonyRennierDISA/DSO (DMI) 10MemberReinhardSchrageSchrageConsult 11MemberNileshKhamberkarUniv. of Buffalo 12MemberHarrisZebrowitzDISA/DSO - MITRE 13MemberYuriyPosherstnikUS Army RDECOM CERDEC 14ParticipantJesseCaufieldKeybridge 15MemberColbyHarperPathfinder Wireless Corp 16ParticipantMarkJohnsonAerospace Corp.

4 IEEE 1900.5 activities 11/1/2015Doc #: 5-15-0023-00-mmat4 Meetings Held (Since 25 February 2015) TypeDatesAttendeesMinutes Electronic WG Meeting 3/3/15135-15-0021-00. WG Meeting F2F 3/24- 26/15 3/24 = 8/8 3/25 = 10/9 3/26 = 8 Total 12 TBD --

5 Upcoming IEEE 1900.5 events 11/1/2015Doc #: 5-15-0023-00-mmat5 Meetings Planned TypeDatesNotes Electronic WG 4/7/15 @ 11:30 EST (UTC-5) First Tuesday of every month. Most likely cancelled due to proximity to March F2F. F2F WG3/24-26/15F2F at WInnF in San Diego, CA.

6 Issues for DySPAN-SC 1900.5 MOU with WInnF – Waiting for IEEE to sign Joint meeting with WinnForum Board of Directors – Resulted in increased interest in 1900.6 Motion to Approve 1900.5 Chair filing for PAR extension on 1900.5.1 through 12/17 Use of DySPAN-SC funds – Can we send people to represent DySPAN-SC at conferences? – Reduced meeting fees? Upcoming conference of interest – IEEE CSCN, Tokyo, Japan 28-30 October 2015 11/1/2015Doc #: 5-15-0023-00-mmat6

7 1900.5.1 PAR Extension Material 11/1/2015Doc #: 5-15-0023-00-mmat7

8 Working Schedule for 1900.5.1 Complete Draft for Clause 47/15 Complete Draft for Clause 510/15 Complete Draft for Clause 61/16 Complete Draft for Clause 73/16 Annex A6/16 First WG Ballot6/16 WG Recirc8/16 WG Recirc 210/16 Sponsor Ballot1/17 Sponsor Recirc3/17 Sponsor Recirc 25/17 Submit to REVCOM6/17 11/1/2015Doc #: 5-15-0023-00-mmat8

9 PAR Extension Questions P1900.5.1 1. Number of years that the extension is being requested: 2 years NOTE: The average extension request is for one or two years. NesCom will consider requests for extensions of three or four years on an exceptional basis. Such requests must be supported with sufficient detail on planned actions and activity dates to provide reasonable confidence that the project can be completed within the extended time. 2. Why an Extension is Required: A partial draft has been completed and a development plan for the standard is provided in 5-15-0019-03. The work required to realize the scope of the project is larger than initially realized. The WG has taken steps to minimize the additional work required by identifying other standards and specifications to incorporate by reference. We now believe 2 additional years is sufficient to complete the project. This should include a description of what the working group has accomplished and what remains to be accomplished, along with the reasons why the work was unable to be completed in the allotted time frame 3.1. What date did you begin writing the first draft: 08/24/2013 3.2. How many people are actively working on the project: 7 3.3. How many times a year does the working group meet: In person: 3 Via teleconference: 12 + Ad Hocs 3.4. How many times a year is a draft circulated to the working group via electronic means: On average 4 3.5. What percentage of the Draft is stable: 30% 3.6. How many significant work revisions has the Draft been through: 1 4. When will/did sponsor balloting begin: 1/2017 When do you expect to submit the proposed standard to RevCom: 6/20 17 Has this document already been adopted by another source?: No. 11/1/2015Doc #: 5-15-0023-00-mmat9


Download ppt "11/1/20151 Document Title: IEEE 1900.5 WG Status as of 26 March 2015 - Closing Document Date: 26 March 2015 Document No: 5-15-0023-00-mmat Author’s NameAffiliationAddressPhoneemail."

Similar presentations


Ads by Google