Review of Blasting Procedures 1 Utah Regulatory Program Evaluation Year 2002 Review of Blasting Procedures to Ensure Public Notice, Public Participation, and Public Safety
2
Review of Blasting Procedures2 Topic Evaluation Team OSM-- Henry Austin OGM-- Peter Hess, Wayne Western, Daron Haddock
3
Review of Blasting Procedures3 SMCRA Goal Section 515 (b) (15) A) provide written notice, B) maintain a log of the blasts, C) limit the blasts based on physical conditions of the site, D) require that blasting be conducted by certified persons, E) provide for pre-blast surveys
4
Review of Blasting Procedures4 Reason for Topic Selection Surface Blasting in Utah has been infrequent Inception of surface mining in Utah (Whisky Creek Mine) Will ensure that Customer Service Needs are met by providing public notice, public participation, and public safety.
5
Review of Blasting Procedures5 Planned Review Records review covering the last 3 years 3 mines would be chosen to further evaluate. Records review in DOGM Office On-Site Evaluation
6
Review of Blasting Procedures6 Records Review Required blast plan Blast schedule publication and distribution Comments from structure owners (1/2 mile) Pre-blast survey Seismic monitoring records
7
Review of Blasting Procedures7 On-Site Evaluation Records Maintained at mine site Blasting logs Blast design and diagrams Notice of publication Blast certification Blast Warning Signs
8
Review of Blasting Procedures8 Mines Evaluated White Oak (Whisky Creek Mine) Dugout Canyon Mine Star Point Mine
9
Review of Blasting Procedures9
10
10
11
Review of Blasting Procedures11
12
Review of Blasting Procedures12
13
Review of Blasting Procedures13
14
Review of Blasting Procedures14
15
Review of Blasting Procedures15
16
Review of Blasting Procedures16
17
Review of Blasting Procedures17
18
Review of Blasting Procedures18
19
Review of Blasting Procedures19
20
Review of Blasting Procedures20 CONCLUSIONS The requirements as they relate to public notice, public participation, and public safety have been met All structures within ½ mile were identified Notification for pre-blast survey and blast schedule were provided to all structure owners. Blasting records including blast designs were maintained. (although evidence of the required written notification could not be produced for two of the mines) Blasting was done by a Utah Certified Blaster.
21
Review of Blasting Procedures21 RECOMMENDATIONS DOGM should ensure that plans include provisions for the permittee to provide required written public notifications and provide evidence that the required written notifications were executed in a timely manner. DOGM should inform permittees that newspaper publication is not required for underground coal mining and reclamation activities.