13 th SEPTEMBER 2011 Ashton Coal Operations Pty Limited Community Consultative Committee EnvironmentalReport Environmental Report
2
Ashton Monitoring Locations
3
Depositional Dust Monitoring
4
Total Suspended Dust Monitoring
5
PM 10 Dust – Site 1 Monitoring Maximum daily limit 50µg/m 3
6
PM 10 Dust – Site 2 Monitoring Maximum daily limit 50µg/m 3
7
Monitoring Maximum daily limit 50µg/m 3 PM 10 Dust – Site 3
8
Monitoring Maximum daily limit 50µg/m 3 PM 10 Dust – Site 8
9
Blasting Statistics at 1 st September 2011 Criteria ChurchVillage VOPV Maximum21163114 Average11041103 >2 mm/s02% (2) >10 mm/s00 >115 dBA2% (2)0 >120 dBA0 87 blasts have been fired for the reporting period to date.
10
Rainfall Monitoring
11
Water Sampling Locations Monitoring
12
Water Quality - pH
13
Monitoring
14
Water Quality - pH
15
Water Quality - EC Monitoring
16
Water Quality - EC Monitoring
17
Water Quality - EC Monitoring
18
Groundwater Sampling Sites Monitoring
19
Groundwater – Standing Depth Monitoring
20
Groundwater – Standing Depth Monitoring
21
Groundwater – EC Monitoring
22
Groundwater – EC
23
Noise Monitoring Noise Statutory noise monitoring was conducted in August 2011. There were no exceedences for the reporting period.
24
Complaints Community Total complaints 7 –, Total enquiries - 1 OEH
25
Complaints
26
Environment Related Operation Changes Daily Operational Changes DateIssueOperational Changes 5/07/2011Strong NW winds and Increasing dust levels EC spoke with Open Cut Mine Manager they decided to start up second water for in the pit, resulting in 2 large watercarts for 1 digger and 3 trucks in the pit, another smaller one was watering the surrounding areas around the pit. 7/07/2011Winds greater than 10m/sBlast postponed until Friday 8 July at 9:30am
27
Any Questions?