Cleveland Clinic Abu Dhabi Sustainability Case Study Presented by Ted Jacob
2
Patient Tower Offices Gallery D&T
3
The Team OwnerMubadala DeveloperAldar OperatorCleveland Clinic Program ManagerFluor ArchitectHDR, Inc. EngineersTed Jacob Engineering Group
4
Green Principals (American Society of Hospital Engineers) Integration Design Site Design Water Energy Indoor Environmental Quality Material & Products Construction Practices Commissioning Operations & Maintenance Innovation
5
Green Guidelines US Green Building Council (USGBC) LEED Green Building Rating Green Guide for Healthcare (GGHC) Emirates Green Building Council (EGBC) Abu Dhabi Green Buildings (ADGB)
6
CATEGORYUSGBCGGHCEGBCADGB Sustainable Sites14211315 Energy & Atmosphere17211620 Water Efficiency561230 Materials & Resources13211115 Indoor Environmental Quality152415 Innovation & Design Process5455 Total Points699772100 CERTIFICATIONUSGBCGGHCEGBCADGB Certified26 - 32N/A29 - 3545 Silver33 - 38N/A36 – 4355 Gold39 - 51N/A44 –5765 Platinum 52 or more N/A58 or more 75 or more Design & Construction Rating Systems
7
CATEGORYUSGBCGGHCEGBCADGB Integrated OperationsN/A5 Transportation OperationsN/A3 Energy EfficiencyN/A18N/A Water ConservationN/A8 Chemical ManagementN/A5 Waste ManagementN/A6 Environmental ServicesN/A9 Environmental Preferable PurchasesN/A11N/A Innovation in OperationsN/A7 Total PointsN/A72N/A Operations
8
Unique Design Challenge Initial and Operating Costs Integrated Design Design for Medical Indoor Environment Continuously Changing Medical Technology Design for Future Expansion Design for Diverse Functions Diverse Occupancy and Operating Schedules
9
Unique UAE Design Conditions High Temperature High Humidity Sand Storms Water Shortage
10
Life Cycle Cost Sustainable Hospital vs. Traditional Hospital First Cost Operation Cost Replacement Cost Payback
11
9.5 / 6.8 1 14.2 / 12.4 279 18.7 / 15.8 1712 23.8 / 19.6 2061 28.1 / 23.1 1203 30.8 / 25.3 1375 33.5 / 26.2 992 36.2 / 26 687 38.9 / 25.4 333 41.4 / 24.8 91 46.1 C DB / 23.8 C WB Dry Design Conditions 43.8 C DB / 23.0 C WB ASHRAE Design Conditions 43.55 / 24.6 33 33.3 C DB / 30.7 C WB ASHRAE Dehumidification Design Conditions 12 C DB / 12 C WB Cooling Coil Leaving Air Conditions 24C DB & 55%-58% RH Room Conditions Comfort Zone
12
Optimize Energy Performance Heat Recovery- Exhaust - Kitchen Equipment - Re-heat Coils Double Skin Defensive Buffer Zone Variable Air Volume Displacement Ventilation
13
Heat Recovery
14
Displacement Ventilation Smoke Test
15
Displacement Ventilation
16
120 CFM @ 3.6 AC/HR Cooling: 18.0 °C Supply Air 240 CFM @ 7.2 AC/HR Cooling: 18.0 °C Supply Air HeightRoomWindowBath 9’-0”--- 8’-6”24.124.421.1 8’-0”23.724.421.3 7’-0”23.623.521.6 6’-0”23.423.321.9 5’-0”23.3 22.2 4’-0”23.3 22.2 3’-0”23.023.322.3 2’-0”21.220.522.5 1’-0”--- HeightRoomWindowBath 9’-0”--- 8’-6”23.624.722.2 8’-0”23.323.621.9 7’-0”22.823.621.9 6’-0”22.822.521.7 5’-0”22.722.521.8 4’-0”22.722.322.2 3’-0”22.021.922.2 2’-0”21.021.621.3 1’-0”--- Room Temperature Profile Displacement Ventilation
17
Patient Tower Offices Gallery D&T
18
PATIENT TOWER
19
HVAC System Options
21
Solar Hot Water
22
Water Efficiency Eliminate Potable Water Use for Medical Cooling Potable Water Measurement and Verification Reduce Use of Potable Water in Building Systems Equipment Provide System to Capture AHU Condensate
23
Grey Water Recovery
24
Condensate Water Recovery
25
Reclaimed Water (Grey Water and Condensate)