1 Feedback from the executive committee meeting Benno Willke GEO meeting, Glasgow October 2006
2
2 GEO600 – future as GEO in its current sensitivity does not contribute much to the S5 data analysis we decided to stop S5 24/7 mode now we support the proposal made by the commissioning group which should lead to a new decision point in March when we know more: could excess noise 200-500Hz and above 500Hz be found and reduced what are the prospects of further improvements in the sensitivity how close are we to H2 can LIGO commit to run H2 in coincidence with GEO in 2008 commissioning team works full time on this main goal of commissioning: to take data providing coverage while H1 and L1 are down (2008)
3
3 GEO600 – future we do not define a sensitivity goal / best effort we do not produce veto lists for S5 but follow the required steps to have the veto pipelines available if required we should try to better understand the low frequency glitches and reduce them when enhanced detectors are in science mode we take GEO down for conversion into a high frequency detector GEO-HF
4
4 GEO instrument-research groups to better coordinate experimental work in GEO and, in particular, to better support the different projects (GEO600, Advanced LIGO, LSC, GEO prototypes, Advanced Virgo, ILIAS) the GEO research groups will be subsystem base and not project based the goal is that each groups covers all aspects of the subsystem from R&D to commissioning (including proposal writing if applicable) we will start with the following groups seismic isolation and suspension (Sheila) simulations (Andreas) optical layout (NN) controls (NN) detector and prototype diagnostic (NN)
5
5 road map we started a roadmap discussion GEO600 commissioning and data taking in 2008 and AdvLIGO (lasers/suspension) are the two projects with highest priority in parallel the GEO research groups start the design work for GEO-HF, Prototype work etc. and help with EU design study proposal group members who are part of the commissioning team invest only very limited amount of time in research groups until the detector is ready for the data-taking period in 2008