Download presentation
Presentation is loading. Please wait.
Published byEdwin Wilcox Modified over 8 years ago
1
CASE STUDY NENAGH REGIONAL WATER SUPPLY PLANT
2
PUBLIC WATER SUPPLIES PERSPECTIVE BOTTLED WATER USAGE in IRELAND BOTTLED WATER USAGE in IRELAND = 0.3 million Litres / day = 0.3 million Litres / day NENAGH R.W.S.P. PRODUCTION NENAGH R.W.S.P. PRODUCTION = 7.5 million Litres / day = 7.5 million Litres / day NORTH TIPPERARY Co. Co. PRODUCTION NORTH TIPPERARY Co. Co. PRODUCTION = 26 million Litres / day = 26 million Litres / day
3
PUBLIC WATER V’s BOTTLED WATER
4
SUPPLY √ TREATMENT X
5
COMMISSIONED - 1997 COMMISSIONED - 1997 1. ISO9001 - 1998 2. HYGIENE MARK - 1999 3. Q – MARK - 2000 4. ISO14001 - 2003 5. E.T.P. - 2005 NENAGH R.W.S.P.
6
Nenagh Regional Water Supply Plant
7
PROCESS CHEMICALS SPECIFICATION (Food Grade, Conc., Tolerance) SPECIFICATION (Food Grade, Conc., Tolerance) CERTIFICATE OF ANALYSIS CERTIFICATE OF ANALYSIS CHEMICALS FOLDER CHEMICALS FOLDER SUMMARY RECORD SUMMARY RECORD TRACEABILITY TRACEABILITY
8
Source Water
9
Coagulation & Flocculation
10
PROCESS CONTROL CHEMICAL DOSING - 7 CHEMICALS - 7 CHEMICALS - VERIFICATION - DAILY - DAILY
12
Aluminium Sulphate (8%) TARGET TARGETDOSE 5 % TOLERANCE 5 % TOLERANCE ALLOWABLE RANGE 80 804 76 - 84 100 1005 95 - 105 120 1206 114 - 126 140 1407 133 - 147 160 1608 152 - 168 180 1809 171 - 189
14
LOG OF CHANGES TO DOSE RATES DATE (%) S. ACID (ppm) ALUM. (ppm) POLY. (ppm) CARBON (ppm) CL2 (ppm) F REASON APPROVED BY 3 FEB -170 - - - - ELEVATED SOURCE COLOUR MB 10 MAY -- - 10 2.9 - SUMMER DOSING SEASON MB 1 JUNE 70120 - 15 - - LOWER SOURCE COLOUR - TASTE JM 5 JULY 82100 - - - - LOWER SOURCE COLOUR MB 20 JULY - - -253.1 - INCREASE FREE RES CL2 MB 2 SEPT - - - -3.3 - INCREASE FREE RES CL2 MB
15
ENHANCED COAGULATION
16
DOSING - REFERENCE CHART LAKE COLOUR ALUM DOSE CARBON DOSE COAG. PH PHSETTLEDTURB.CL2DOSE FINAL W. FREE CL2 THM JAN - FEB 6218006.780.592.92.265 MAR - APR 5517506.800.482.82.155 MAY - JUNE 42135156.340.383.02.173 JULY - AUG 42130256.300.403.12.280 SEPT - OCT 51150256.240.573.32.390 NOV - DEC 5816506.840.553.02.355
19
Carbon Dosing
20
CLARIFICATION & FILTRATION CLARIFIERS - 3 x 500 M3 Tanks - 3 x 500 M3 Tanks - Upward Flow Rate (Max.) = 1.8 - Upward Flow Rate (Max.) = 1.8 M/Hr. FILTERS - 3 x R.G. Sand Filters - 3 x R.G. Sand Filters - Filtration Rate (Max.) = 3.9 M/Hr. - Filtration Rate (Max.) = 3.9 M/Hr.
21
TURBIDITY MONOTORING
22
POST - FILTRATION CHLORINE DIOXIDE - Taste CHLORINE DIOXIDE - Taste CHLORINATION - T.H.M. CHLORINATION - T.H.M. FLUORIDATION FLUORIDATION PHOSPHORIC ACID - Enhanced Coagulation PHOSPHORIC ACID - Enhanced Coagulation
23
CHLORINE DIOXIDE
26
CHLORINE CONTROL
27
INSPECTION & TESTING SAMPLING PLAN SAMPLING PLAN - SOURCE WATER - SOURCE WATER - SETTLED WATER - SETTLED WATER - FILTERED WATER - FILTERED WATER - FINAL WATER - FINAL WATER
29
Final Water Cryptosporidium Monitoring
31
Continual Improvement Key Performance Indicators (K.P.I.) Key Performance Indicators (K.P.I.) - Process - Process - Quality - Quality - Cost - Cost - Environmental - Environmental - External Audit Results ( eg. H-Mark Score) - External Audit Results ( eg. H-Mark Score)
35
Issues Issues Process Chemicals - data Process Chemicals - data CAR’s - review CAR’s - review Paperwork - volume Paperwork - volume Design - practical Design - practical
36
END
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.