Download presentation
Presentation is loading. Please wait.
Published byEthel Anderson Modified over 8 years ago
2
2 Rental Cat believed in the future of rentals. EI was convinced, made major investments and has had some of the most successful projects in the rental world.
3
3 1998 - Our first rental deal was in Guyana for 15 MW #1: First rental project
4
4 Then an Oil & Gas application Venezuela – Guafita – 20 MW #2: First O&G rental
5
5 Venezuela – Isla Margarita – 44 MW From order to “power on” in record time – 20 MW in 30 days and balance in 45 days #3: Fastest rental start-up
6
6 1998 - Our first rental project in Brazil Brazil – Boa Vista – 20 MW #4: First rental - Brazil
7
7 Brazil – Porto Vehlo – 40 MW #5: Growing penetration utility rentals
8
8 Guyana II – 3 MW
9
9 Brazil – Rio Branco I – Electro Norte – 20 MW
10
10 Brazil – Rio Branco II – Barro Vermelho - 40 MW
11
11 USA – Detroit, Michigan – Rouge Steel – 40 MW #6: First rental – U.S.A.
12
12 USA – Zilwakee - Saginaw, Michigan – 40 MW
13
13 Colombia – Leticia – Amazon Energy – 2.8 MW Project required barging 2 units up the Amazon River #7: Most difficult logistics - rental
14
14 Haiti – Port au Prince – EDH – 20 MW #8: First rental - Haiti
15
15 Peru – Yanacocha Gold Mine – 8 MW Site at 4000 meters altitude #9: Rental at high altitude
16
16 Brazil – Tubarao – 40 MW #10: The Gigawatt – the largest rental project
17
17 Brazil – Carapina – 40 MW
18
18 Brazil – Civit – 20 MW
19
19 Brazil – Jardim – 60 MW
20
20 Brazil – Rio Largo – 148 MW “THE LARGEST CONCENTRATION OF POWER MODULES IN THE WORLD” 108 units/148 MW #11: Most PMs at one site
21
21 Brazil – Parnamirim – 90 MW
22
22 Brazil – Ubu – 40 MW
23
23 Brazil – Aruana – 48 MW
24
24 Brazil – Tubarao
25
25 Brazil – Carapina – 40 MW
26
26 Brazil – CEAM – 35 MW #12: 20 cities project
27
27 CEAM Project – Brazil – Covering 20 cities with 23 units for 35 MW
28
28 Colombia – Cusiana – British Petroleum – 5.2 MW First rental of a Solar turbine #13: First Solar rental
29
29 CEA – Brazil – Covering 2 cities – 11.6 MW
30
30 Belize – 10 MW #14: First rental - Belize
31
31 Colombia – Drummond Ltd., Pibbenow Mine – 1.6 MW
32
32 Guyana - Guyana Power Light – 7 MW
33
33 Many other rental contracts: Venezuela - 1.6 MW Mexico – 2.9 MW USA – 13 MW Colombia – 4.4 MW West Indies – 1.5 MW Belize – 4.4 MW Guyana – 5.8 MW Guyana - 5.8 MW Guyana - 1.5 MW Puerto Rico - 2.9 MW Argentina – 2.9 MW USA – 2.9 MW USA - 4.4 MW Brazil – 8.7 MW, Brazil - 4 MW, Brazil - 5.6 MW Venezuela – 1.6 MW
34
34 The rental business requires highly qualified personnel for commissioning, startup and O&M
35
35 EI owns 87 power modules and 87 transformers Soenergy has 66 of each At Brasympe we have 199 modules and 204 transformers
36
36 Energy International has supplied over 900 MW in rental contracts spanning 428 months in 14 countries
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.