Download presentation
Presentation is loading. Please wait.
Published byAmber Bailey Modified over 9 years ago
1
Safety during LS1 EN-STI Group meeting 1st February 2013 AP.Bernardes EN/STI
2
LS1 - Safety 201/02/2013 AP.Bernardes EN/STI Safety training DIMR (Dossier d'Intervention en Milieu Radioactif ) VIC “Visite d’Inspection Commune” Collective measures and PPE (Personal Protective Equipment) EN-STI Safety achievement
3
Safety training 301/02/13AP.Bernardes EN/STI Safety training For accessFor activity
4
Safety training SIR 401/02/2013 AP.Bernardes EN/STI Safety course https://sir.cern.ch/ Mandatory for anyone Mandatory for all professional categories other than administrative category Mandatory for access to the area
5
Safety training ACCESS 501/02/2013AP.Bernardes EN/STI ADaMS http://adams.web.cern.ch/ Only SIR course
6
Safety training ACCESS 601/02/2013AP.Bernardes EN/STI Mandatory for access to the area
7
Safety training website DGS/SEE: https://espace.cern.ch/info-safetytraining- official/safety_training_for_me/Pages/default.aspxhttps://espace.cern.ch/info-safetytraining- official/safety_training_for_me/Pages/default.aspx Training catalogue: https://cta.cern.ch/cta2/f?p=110:9:205103288101210https://cta.cern.ch/cta2/f?p=110:9:205103288101210 701/02/2013AP.Bernardes EN/STI Safety training Link to activity Electrician or people with “habilitation électrique” authorized by supervisor
8
801/02/2013AP.Bernardes EN/STI Safety training website DGS/SEE: https://espace.cern.ch/info-safetytraining- official/safety_training_for_me/Pages/default.aspxhttps://espace.cern.ch/info-safetytraining- official/safety_training_for_me/Pages/default.aspx Training catalogue: https://cta.cern.ch/cta2/f?p=110:9:205103288101210https://cta.cern.ch/cta2/f?p=110:9:205103288101210 Safety training Link to activity EN/HE or people with appropriate training and authorization from supervisor for crane, forklift, platform…
9
DIMR 9 01/02/2013 AP.Bernardes EN/STI 1 day training WDP and DIMR may be needed in all classified areas to fulfill ALARA criteria WDP : Work and Dose Planning DIMR : Dossier d’Intervention en Milieu Radioactif ALARA : As Low As Reasonably Achievable STAFF and assimilate
10
DIMR 10 01/02/2013 AP.Bernardes EN/STI 1 day training WDP and DIMR coordination should be done by CERN in collaboration with the PCR of the company External Contractors: National dosimeter + CERN dosimeter mandatory & PCR mandatory PCR : Personne compétente en Radioprotection No CDD No temporary labour No CDD No temporary labour
11
DIMR 1101/02/2013AP.Bernardes EN/STI WDP to be completed and linked to IMPACT contact RSSOs or RSOs WDP template: https://espace.cern.ch/rpps/wdp/default.aspxhttps://espace.cern.ch/rpps/wdp/default.aspx Link to IMPACT: https://pptevm.cern.ch/impact/https://pptevm.cern.ch/impact/
12
1201/02/203AP.Bernardes EN/STI VIC WORK SITE ACTIVITY Declare your worksite through IMPACT or an AOC (if the facility is not using impact) VIC are mandatory before starting (All work in accelerators – All work with co-activities) Safety recommendation to be implemented by work site supervisor before starting activity safety-coordination@cern.ch
13
1301/02/2013AP.Bernardes EN/STI Collective & PPE “Complying” Collective prevention measure should be the priority Mandatory PPE for ACCESS all accelerators and experimental halls (EDMS 1223620) Extra PPE requested for specific facilities mentioned in SIR safety course
14
1401/02/2013AP.Bernardes EN/STI Collective & PPE PPE protecting against fatal hazard Training with practice is mandatory
15
1501/02/2013AP.Bernardes EN/STI EN-STI Safety achievement CERN direction safety objectives achieved by EN-STI Inventory of chemical and radiological equipment requested for EN department done by all section of EN-STI (collaboration with J.Pedersen) MANY THANKS for your contribution ! To be keep up to date Acknowledgement: C.Mitifiot, Y.El Boukrini, V.Fedosseev, V.Vlachoudis, E.Chevallay
16
1601/02/2013AP.Bernardes EN/STI EN-STI Safety achievement CERN direction safety objectives achieved by EN-STI Safety campaign on machine tool in EN-STI workshop in collaboration with EN/MME and DGS/SEE MANY THANKS to : E.Barbero EN/STI/RBS Y-El Boukrini EN/STI/TCD E.Chevallay EN/STI/LP J.Lendaro EN/STI/ECE
17
1701/02/2013AP.Bernardes EN/STI EN-STI Safety achievement CERN direction safety objectives achieved by EN-STI ALARA common practice in EN-STI In 2012 no worker above 2 mSv/year 2013 objective for LS1 keep dose for radiation workers below 3 mSv/year
18
Safety is important for EN/STI – Fill free to propose safety campaign Comply with safety rules during LS1to reduce the probability of incident/accident* *Incident/accident should be declare in EDH trough a A2 form https://edh.cern.ch/Document/General/Accident2 1801/02/2013AP.Bernardes EN/STI Conclusion Follow Safety training needed for your access and activities Apply ALARA principle and trace it in a WDP and a DIMR Ask for VIC in time Give priority to safety collective measures Wear your PPE
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.