Download presentation
Presentation is loading. Please wait.
Published byLinette Harper Modified over 9 years ago
1
OEHI Occidental Oil and Gas Corporation
2
OEHI 368-33S – Unloading Well
3
OEHI 381-5G – 5 th Valve Chattering
4
OEHI 381-5G – Changed out 5 th Valve
5
OEHI 381-5G – With Temperature
6
OEHI 381-4G – Liner Lap Leak
7
OEHI
8
OEHI 381-4G – Showing Workover Results
9
OEHI 315-35S – Scale Build-up
10
OEHI 315-35S – Csg/tbg pressures
11
OEHI 322H-3G – Sliding Sleeve Leak
12
OEHI
13
OEHI 322H-3G – 2 nd Valve Leak
14
OEHI
15
OEHI 322H-3G – After replacing 2 nd Valve
16
OEHI 317X-35S – Two Valves Passing
17
OEHI 317X-35S – Changed out valves
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.