Presentation is loading. Please wait.

Presentation is loading. Please wait.

10 th SG meeting Madrid 13 th November 2009. 2 Index 1.2015 Capacities – Results 2.2013 Capacities – Further steps 3.2015 Capacities – Further steps.

Similar presentations


Presentation on theme: "10 th SG meeting Madrid 13 th November 2009. 2 Index 1.2015 Capacities – Results 2.2013 Capacities – Further steps 3.2015 Capacities – Further steps."— Presentation transcript:

1 10 th SG meeting Madrid 13 th November 2009

2 2 Index 1.2015 Capacities – Results 2.2013 Capacities – Further steps 3.2015 Capacities – Further steps

3 3 2015 Capacities – Results 1

4 4 2015 Capacities – First Phase Results 15 different requests were received by the Joint Allocation Office: 10 for “Independent allocation per point” and 5 for “Coordinated allocation “. All the requests were for Multiannual capacity. It should be borne in mind that at the cross border point between Spain and France two options were proposed: Option 1: Three-step entry-exit system Spain ↔ TIGF ↔ GRTgaz South (Points C & D) Option 2: Entry-exit system with direct interconnection Enagas ↔ GRTgaz South (Points A & B) Aggregating the options presented, demand for 2015 capacities at the cross border point between Spain and France equals 85.6% of the capacities offered from South to North, and 69.1% from North to South.

5 5 2015 Capacities – First Phase Results Interconnection Point MWh/day A + CB + DEFGH Capacity requested157,52399,52088,35262,52082,632225,512 Capacity offered184,000144,000184,000144,000 80,000 264,000 160,000 281,980 % Requested/Offered85.6%69.1%48.0%43.4% 103.3% 31.3% 141.0% 80.0% 2015 Capacities offered and requested – figures aggregated at the border.

6 6 2015 Capacities offered and requested per point. 2015 Capacities – First Phase Results Interconnection Point MWh/dayACBDEFGH Capacity requested55,992101,53138,00061,52088,35262,52082,632225,512 Capacity offered184,000144,000184,000144,000 80,000 264,000 160,000 281,980 % Requested/Offered30.4%55.1%26.4%42.7%48.0%43.4% 103.3% 31.3% 141.0% 80.0%

7 7 2013 Capacities – Further steps 2

8 8 2013 Capacities – Further steps How to commercialize the portion of capacity not sold from North to South? INFORMATION MEMORANDUM: “Remaining capacity not sold via the current procedure at the Spanish-French border will be sold through coordinated procedures between French and Spanish TSOs to be defined. In France, the detailed rules for marketing this capacity will be submitted to CRE for approval. In Spain, capacity allocation will comply with regulation in force.”

9 9 2013 Capacities – Further steps How to commercialize the portion of capacity not sold from North to South at Larrau? GWh/d Offered S – N at Larrau* 132.00 Allocated S – N 132.00 Non-allocated S – N 0.00 Offered N – S at Larrau* 69.98 Allocated N – S 69.00 Non-allocated N – S 0.98 1 5 Open Subscription Period for Short-Term Capacities (OSP STC) At the points 2, 4 and 3 capacity will be allocated under the current French‘s allocation rules. (*) Total capacities showed in the Information Memorandum included Larrau and Biriatou TSOs proposal

10 10 2015 Capacities – Further steps 3

11 11 2015 Capacities –Non-sold 2013 Capacities The Information Memorandum states: “In the second phase, the sale of capacities not sold during the first phase could be possibly provided NRAs’ prior approval and subject to the frame required by the NRAs if any.”

12 12 NORTH SPAIN SOUTH TIGF Technical capacities provided by MIDCAT South-North 230 GWh/d 7,2 bcm/y North-South 180 GWh/d 5,6 bcm/y 2015 capacities (long-term capacities = 80% of technical capacity at the border) 2015 Capacities – MIDCAT

13 Thank you for your attention!


Download ppt "10 th SG meeting Madrid 13 th November 2009. 2 Index 1.2015 Capacities – Results 2.2013 Capacities – Further steps 3.2015 Capacities – Further steps."

Similar presentations


Ads by Google