Presentation is loading. Please wait.

Presentation is loading. Please wait.

Canta ITE’s Global Technical Operations March 2001 Johnny H. Hansen, GTO.

Similar presentations


Presentation on theme: "Canta ITE’s Global Technical Operations March 2001 Johnny H. Hansen, GTO."— Presentation transcript:

1

2 Canta ITE’s Global Technical Operations March 2001 Johnny H. Hansen, GTO

3 2 Global Technical Operations January 2001 Contents Directional System Microphone alignment Dual Microphone Considerations Parallel microphone manufacture Front & Back microphone orientation ITE / Halfshell / ITC / CIC CIC Issues: Sizing Tool Removal Tool

4 3 Global Technical Operations January 2001 Directionality features. Digital Dynamic Directionality Digital Dual Microphone Technology Adaptive Directionality Active Microphone Matching

5 4 Global Technical Operations January 2001 Digital Dual Microphone Technology

6 5 Polar Pattern dB 50 40 30 20 10 0 Front Back 30 60 90 120 150 180 210 240 300 330 0 60 120 180 50 45 28 ~0 Angle Gain

7 6 Global Technical Operations January 2001 Different Polar Patterns Omnidirectional Cardioid Supercardioid Hybercardioid Bidirectional

8 7 Global Technical Operations January 2001 Polar Patterns Considerations The ratio of the internal electronic time delay and the external time delay. What determines the Polar Pattern of a Directional System ?

9 8 Global Technical Operations January 2001 Digital Dual Microphone Technology Time Delay -1 Front Back + Speed of Sound = 343 m/sec. Canta Microphone Spacing = 10 mm

10 9 Global Technical Operations January 2001 Dual Microphone ITE’s Front Back 10 mm Microphone spacing: 10 mm Microphone must be: Horizontal.

11 10 Global Technical Operations January 2001 Misaligned Microphones 30 o 0 00 0

12 11 Global Technical Operations January 2001 Effect of misaligned Microphones 10 9 0 8 7 6 5 4 3 2 1 2040506070809003010 Actual mic. spacing Degrees misaligned mics. Act. mic.spacing = COS(B) Mic. spacing B a c COS(B) = caca

13 12 Global Technical Operations January 2001 Quiz Impression

14 13 Global Technical Operations January 2001 Answer to Quiz

15 14 Global Technical Operations January 2001 Importance of Placement Key

16 15 Global Technical Operations January 2001 Microphone Orientation Marking During impression taking a microphone placement key must be used in order to indicate the correct orientation of the microphones. Instruct the client to look straight ahead at a point at eye level. Place the placement key at a horizontal position.

17 16 Global Technical Operations January 2001 Parallel Microphone Manufacture 1 Make a marking on the investment according to marks from placement key Transport this marks to the shell

18 17 Global Technical Operations January 2001 Parallel Microphone Manufacture 2 Place the shell on the faceplate Align marks on shell with guidelines on faceplate Scratch a line around the shell Guidelines Scratched line Erase marks on shell Mount shell after scratched line

19 18 Global Technical Operations January 2001 Active Microphone Matching

20 19 Global Technical Operations January 2001 Active Microphone Matching +1.2 -0.5 - 1,2 dB Coyote 1.5 + 0.5 dB Danalogic use matched microphones Digital 5000 match once with FONIX Canta is matched with FONIX and keeps the matching updated all the time. When changing microphone(s) or hybrid remember to match with FONIX

21 20 Global Technical Operations January 2001 Telecoils & Loop systems

22 21 Global Technical Operations January 2001 Telecoil 1000 times/sec. = 1kHz Voltmeter 1 sec. = 1 Hz.

23 22 Global Technical Operations January 2001 Telecoil Voltmeter In a solenoid the iron core is for collecting and rectifying the b-fields Flux = b-fields in an area

24 23 Global Technical Operations January 2001 Misaligned telecoil B-field

25 24 Global Technical Operations January 2001 Loop system Near field Few cm + - Magnetic field (b-field) + -

26 25 Global Technical Operations January 2001 Loop system - field intensity 1 m 2 m 1 m 2 m 10 dB 5 dB 0 dB

27 26 Global Technical Operations January 2001 Telecoil - measuring Coil Magnetic Field Lines Telecoil Magnetic Field Lines CoilTelecoil Frye Interacoustic

28 27 Global Technical Operations January 2001 Telecoil

29 28 Global Technical Operations January 2001 Mounting Telecoil - loop systems Turn on the instrument Listen to the instrument in Telecoil position Move the coil until noise from radiation is at minimum Observe that the coil is within scratched scratched line and in a vertical position Glue the coil in position

30 29 Global Technical Operations January 2001 Front / Back Microphone - 312 faceplate Left Right Front Back

31 30 Global Technical Operations January 2001 Front / Back Microphone - 13 faceplate Left Right Front Back

32 31 Global Technical Operations January 2001 ITE 740-D & 440-D Half-Shell Standard 312 battery Programmable Telecoil

33 32 Global Technical Operations January 2001 ITE 750-D & 450-D Full-Shell Option 13 battery (Full-Shell only)

34 33 Global Technical Operations January 2001 ITC 730 & 430 Standard 312 battery Option Size 10 battery Programmable Telecoil

35 34 Global Technical Operations January 2001 CIC 710 Standard Size 10 battery Removal Cord

36 35 Global Technical Operations January 2001 Canta CIC - Sizing Tool Sizing Tool Kit (P/N 10159700)

37 36 Global Technical Operations January 2001 Canta CIC - Removal Tool Complete CIC Shell, Faceplate and Removal Cord CIC Module Removal Tool Complete CIC Electronics Assembly: Receiver, Hybrid, Microphone, Contact Module and Battery Door

38

39 38 Global Technical Operations January 2001 Some More Information Maybe Another Point Other Standard Colors Still Some More Stuff And Some More Copper Color.


Download ppt "Canta ITE’s Global Technical Operations March 2001 Johnny H. Hansen, GTO."

Similar presentations


Ads by Google