Download presentation
Presentation is loading. Please wait.
Published byDaniella Stephens Modified over 8 years ago
1
Manufacturing cylinder housings (special lengths ) With: Multi-axis machining More Flexible clamping Technology Highly precise and fast positioning Preparation time reduction Throughput Optimisation Results ROEMHELD Systems
2
Throughput Optimisation Results Old Method: 1.2.3.4.5. Vertical M/C „A“Vertical M/C „C“Vertical M/C „B“ Settings/processing steps Average manufacturing lot: 4 Stk. /Order
3
Current manufacturing : „A“ „B“ Page 1 to 5 Page 6 Average manufacturing lot: 3 Stk. /Order Throughput Optimisation Results
4
56 3132 Order time Production Time (te) Preparation Time (tr) 1x Set-up operation with STARK zero-point system 1x Non-Production period 1x NC-Program Read-in 1x Workpiece handling Preparation Time (tr) 4x Manual Set-up operations 4x Non production period 4x NC-Program Read-in 4x Workpiece Handling Time Saving Old manufacturing Current manufacturing 46 Order Time, New 44 37 54 725 Reduction teReduction tr Throughput Optimisation Results
5
Which factors contributed to the improvement ? High Precision and fast positioning No misalignment of Internal and External „set-ups“ Flexible clamping system Multi-axis machining Throughput Optimisation Results
6
Flexible Clamping System Large Clamping Range Adjustable jaws and locations Pre-set the clamping range Adjust the jaws and locations Inserting and clamping the workpiece at the preparation point possible External Preparation Throughput Optimisation Results
7
Further positive effects : Higher Quality Shorter order runs Reduction of logistic expenditure Optimisation of the tool use Advantages: Fewer Settings Complete one step machining No temporary storage, less handling and transport Lower change frequency/ shorter paths Causes: Throughput Optimisation Results
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.