WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,

Similar presentations


Presentation on theme: "WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11,"— Presentation transcript:

1 WSDOT/AGC/ACEC Design- Build Subcommittee Annual Report Scott Ireland / Paul Mayo WSDOT / AGC Co-Chairs WSDOT / ACEC Annual Meeting Bellevue, WA June 11, 2015

2 2015 Annual Report Who we are 2014-2015 Accomplishments Team’s Purpose and Function 2 2014-2015 Focus Areas

3 WSDOT / AGC / ACEC-WA sub-committee team consisting of approximately 25 members (+\-) WSDOT is represented by State Construction Office, State Design Office, State Materials Lab, NWR, OR, SR 520 Program, I- 405 Program, AWV Program and FHWA AGC is currently represented by Max J. Kuney Co., Kiewit, Atkinson, Granite, PCL, Flatiron, and Graham. ACEC is currently represented by Buckland & Taylor, Parsons, AECOM, Rohila Consulting Services, and GeoEngineers. Who we are 3

4 Vision - A nationally recognized Design-Build Program that consistently delivers quality projects through positive coordination with Design-Builders, executed through competitive contracts that appropriately allocate risk, promote innovation and collaboration that ultimately benefits the citizens of Washington. Mission - Founded on strong WSDOT and Design-Builder relationships, further develop and maintain WSDOT’s Design-Build Program based on the values of collaboration, innovation and continuous improvement that result in industry best practices. Purpose - To serve as a resource for establishing Design-Build policy, procedures and process improvement. Team’s Purpose and Function 4

5 Team’s Purpose and Function (continued) 5 Meet approximately every six weeks Provide specific expertise to support Design-Build project delivery Review, comment and collectively discuss high priority RFP sections focused on establishing consistency and appropriate risk allocation. Discus specific Design-Build related topics as they relate to project delivery.

6 2014-15 Accomplishments Established the Team’s Charter and 2015 Goals Focus on standardizing RFP documents including the ITP, Chapter 1 and Chapter 2 RFP documents Established Document Review procedures and have reviewed 4 of 12 RFP Sections Supported the development of WSDOT’s report on Small Design-Build Pilot Projects Represented Washington at the 2015 DBIA Conference 6

7 2014-2015 Focus Areas Complete RFP template contract documents Further refinement of DBE requirements as they apply to DB delivery Formalize WSDOT DB administration processes and policy for consistent statewide application Develop formal Project Delivery Method Selection Guidance Continue to engage and participate in national forums through FHWA and the DBIA Status upcoming DB projects and other opportunities as identified by the subcommittee 7

8 Thank you 8 WSDOT Scott Ireland, PE State Construction Office Assistant State Construction Engineer (360) 705-7468 Flatiron Paul Mayo Flatiron Corp. Northwest Area Manager (425) 508-7713 ACEC - WA Richard Patterson, PE SE Buckland & Taylor / COWI Washington Practice Lead (206) 321-6655