Download presentation
Presentation is loading. Please wait.
Published byWilla Thomas Modified over 9 years ago
1
Conformity Determination Graciela Lubertino, PhD November 7, 2012
2
Conforming the amendments of transportation plans 2035 RTP Update 2013 – 2016 TIP To the last revision of the State Implementation Pan for the 1997 8-hr Ozone Standard – classification: “severe”
3
Last conformity (Phase I) was approved by FHWA 9/20/2012 New conformity (Phase II): Interim managed lanes US 290 and SH 288 Improvements FM 521 in Harris & Brazoria Co Improvements FM 2234 in Brazoria Co Connections from SH 288 and IH 610 to Texas Medical Center The full list of projects is on Appendix 12
4
How we select the conformity years? Need to conform to all years that we have budgets from the SIP RFP SIP: 2011, 2014, 2017, 2018 AD SIP: 2018 The last year of the transportation plan: 2035 The years cannot be more than 10 years apart: 2025
5
Draft Air Quality Results YearNOx Emissions (tons/day) NOx Budget (tons/day) VOC Emissions (tons/day) VOC Budgets (tons/day) 2011128.18135.7469.7575.17 201491.1195.2659.9061.84 201760.8667.9548.5053.23 201848.7249.2245.8445.97 202532.9649.2238.4245.97 203535.1749.2245.7145.97 http://www.h- gac.com/taq/airquality_model/conformity/2012_phase2/default.aspx or http://tiny.cc/3f2cnw
6
DRAFT-Timeline Beginning September 2012 - Start updating the networks Mid September - Mid October 2012 Complete travel demand model runs Start conference calls with conformity consultation partners Start conformity air quality calculations and documentation October 26, 2012 – TPC information item of Conformity finding End October 2012 – Submit air quality results to conformity consultation partners October 31, 2012 – Start public comment period November 7, 2012 – TAC information item of Conformity finding November 13, 2012 – Public meeting November 29, 2012 – Close of public comment period. November 30, 2012 - TPC final approval of Conformity finding. Beginning December 2012 –Conference call with conformity consultation partners to finalize the Conformity Finding.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.