Download presentation
Presentation is loading. Please wait.
Published byEmery Terry Modified over 9 years ago
1
Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- Objectives of the technical Work Packages To create the technical information content of the web-site (WP4 to WP9) Information would be provided by a blend of sources, by links to existing sites, by e-mail to expert or resources, by texts and articles, EVITherM The European Virtual Institute for Thermal Metrology _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
2
Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- Objectives of WP6 WP 6 defines the technical content for emissivity and other infrared-optical properties. Information related to the following categories will be collected and made available: Facilities for measurements Sources of technical data Best practice guides Reference material Standardisation Topics of interest EVITherM The European Virtual Institute for Thermal Metrology _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
3
EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- WP6: Description of Work Tasks Task 6.0 (CNR-IMGC) Define the content of the Work Package Provide a review of all data entries Evaluate the material from other WPs pertinent to this field. Task 6.1 (NPL) Content of a database that includes all facilities for measurements in this field in Europe. The database will include: measurement providers, measurement devices, calibration and testing laboratories in Europe. _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
4
EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- continue WP6: Description of Work Tasks Task 6.2 (LNE) Identify qualified sources of technical data in this field.. Review the best sources of data for various applications (radiation thermometry, remote sensing, solar energy applications, heat exchange calculations, data for characterisation of optical materials) Task 6.3 (ZAE) Collect existing material related to best practice guides, measurement procedures and use of measurement devices. Provide a review of existing material and identify additional needs. _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
5
EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- continue WP6: Description of Work Tasks Task 6.4 (RISOE) Identification of available certified reference materials and their sources of supply. Additional reference materials (not certified) will also be identified. Needs for additional reference materials. Task 6.5 (2 new members) Review of topics of interest and overview of technology and research outputs in the field plus an overview of where future work is required. Database for industrial requests of norms, accreditation rules and legal metrology requirements Links with organisations for standardisation and with accreditation bodies. _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
6
EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- Proposal for an updated WP6 plan _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
7
EVITherM The European Virtual Institute for Thermal metrology Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
8
EVITherM The European Virtual Institute for Thermal Metrology Emissivity and other infrared-optical properties (WP6) ------------------------------------------------------------------------------------------------------------------- ACTION D.4:WPLs to arrange meetings with their members to discuss technical aims of WP. A key output of each of these meetings should be list of the planned WP outputs prioritised for phasing onto the EVITherM website. …. EVITherM Steering Group Meeting 28 January 2003 _____________________________________________________ WP 6 Kick-off Meeting, IMGG, Turin, Tuesday, 22 April 2003
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.