Presentation is loading. Please wait.

Presentation is loading. Please wait.

May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using.

Similar presentations


Presentation on theme: "May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using."— Presentation transcript:

1 May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using

2 Bus Rapid Transit High performance High level & quality of service Quality image Unique identity

3 Maximizing Capacity with BRT Investment Cost System Performance BRT Mixed traffic w/ signal priority Exclusive w/ signal priority Use of shoulders Use of existing medians Express bus Local bus Light rail Heavy rail Max Capacity in Existing ROW

4 Mixed Traffic BRT Mixed traffic Signal priority Queue jumps Bypass lanes Other BRT elements

5 Use of Existing Medians Wider corridors 1- or 2-way U.S. experience – Cleveland – Eugene Safety Concerns – Left turns – Passenger crossings

6 Bus Use of Shoulders 11+ projects in U.S. – Minneapolis – Seattle – Delaware – Miami – Lee County – Others TCRP Synthesis 64 Matanzas Pass Bridge to Ft. Myers Beach

7 Bus Use of Shoulders Minneapolis – 400 buses, 14 routes – 230 miles now – 300 miles (2007) Bypass congestion (<35 mph) Minimal signs No pavement markings

8 Contact Information For more information, please contact: Bill Ball, AICP and Joel Rey, P.E., AICP Tindale-Oliver & Associates, Inc. 1000 N. Ashley Drive Suite 100 Tampa, FL 33602 (813) 224-8862 bball@tindaleoliver.com


Download ppt "May 10, 2007 Presented by: Bill Ball, AICP and Joel Rey, P.E., AICP BRT To Maximize Person Capacity Within Limited ROW Using."

Similar presentations


Ads by Google