ANCIT WORKSHOP Torino, 30-31 March 1998. ANCIT WORKSHOP Torino, 30-31 March 1998.

Similar presentations


Presentation on theme: "ANCIT WORKSHOP Torino, 30-31 March 1998. ANCIT WORKSHOP Torino, 30-31 March 1998."— Presentation transcript:

1 ANCIT WORKSHOP Torino, 30-31 March 1998

2 ANCIT WORKSHOP Torino, 30-31 March 1998

3 ANCIT WORKSHOP Torino, 30-31 March 1998 Feasibility Studies and Planning Design Procurement Engineering and Network Construction Maintenance Telecommunication Networks Management Systems Sirti’s offer

4 ANCIT WORKSHOP Torino, 30-31 March 1998

5 ANCIT WORKSHOP Torino, 30-31 March 1998 l Optical connection at the same network level and between different ones l 1/2 N3 frame with up to 10 optical modules (up to 160 SC or FC connections) l Both vertical and horizontal distributions l Side by side frame installation l In-module patch-cord extralength organizer

6 ANCIT WORKSHOP Torino, 30-31 March 1998

7 ANCIT WORKSHOP Torino, 30-31 March 1998

8 ANCIT WORKSHOP Torino, 30-31 March 1998 New FN underground cabinet (high capacity) New HFC underground cabinets New LA underground cabinet (1 LA max.+ 3 RF passives)

9 ANCIT WORKSHOP Torino, 30-31 March 1998 406 886 l Waterproof (IP68) sheet molding compound cabinet l Up to 1 Last Amplifier and 3 RF passives l Up to 35 watt inside heat dissipation l Compact size, easy installation, low cost

10 ANCIT WORKSHOP Torino, 30-31 March 1998 l Waterproof (IP68) carbon steel cabinet l Typical capability: 1 Optical Termination, 1 E/O Converter, 1 Launch Amplifier, 1 Last Amplifer, 1 Power Supply, a set of passives l Up to 200 watt inside all passive heat dissipation l Push-pull pantograph for easy equipment extraction

11 ANCIT WORKSHOP Torino, 30-31 March 1998 Central Station Base Station Switched line Central Monitoring Office ExchangeFieldExchange 1 N 1 15 Outposts Cable sheath under testSurge arrestor Max. 8 km Max. 100 km

12 ANCIT WORKSHOP Torino, 30-31 March 1998 power ground (  400  manhole rod) signal ground (  4000  manhole frame) outpost connection for sheaths and sensors o.f. cable splice enclosure

13 ANCIT WORKSHOP Torino, 30-31 March 1998

14 ANCIT WORKSHOP Torino, 30-31 March 1998 In 1996 Sirti Polska carried out the crossing of Vistula river near the centre of Warsaw by means of a 770 m directional drilling

15 ANCIT WORKSHOP Torino, 30-31 March 1998 In 1996 Sirti Portugal carried out the installation of an 840 km optical cable link along a TRANSGAS gas-pipeline by means of air blowing l 6 km optical cable drums were used l 4 intermediate blowing points for each cable drum were located by means of calculations in order to consider installation conditions

16 ANCIT WORKSHOP Torino, 30-31 March 1998 Sirti Portugal’s TRANSGAS Project Air blowing installation main features: l Cable diameter: 13 mm l Cable weight: 150 g/m l Duct inner diameter: 41 mm l Air speed: 3000 m/min. l Cable speed: 50 m/min. l 1-2 cable drums (6-12 km) a day on average

17 ANCIT WORKSHOP Torino, 30-31 March 1998 lashed or wrapped ADSS OPGW ADSS Since 1983 (Suvereto, Italy, 1000 kV power line for ENEL) Sirti has been installing aerial optical cable of different types. Present activities are: l ADSS cable: 100 km link for Telecom Colombia (350 m of cable for each span) l OPGW cable: 300 km link for ENEL l Wrapped cable: 1300 km link for ENEL

18 ANCIT WORKSHOP Torino, 30-31 March 1998 Ad hoc, low cost and easy istallation solutions for special situations are often directly designed by Sirti The installation of a leaky cable for mobile services into a railway tunnel is carried out by means of properly designed accessories

19 ANCIT WORKSHOP Torino, 30-31 March 1998

20 ANCIT WORKSHOP Torino, 30-31 March 1998 l All dielectric broad band link l 2 GHz downstream bandwidth l Low environmental impact l Easy installation l Full compliance with future network and service evolution l Up to 4 user terminal equipment l Low cost

21 ANCIT WORKSHOP Torino, 30-31 March 1998 (c)(d) a) - HFC bus architecture for premises coaxial cabling b), c), d) - Different architectures for traditional antenna plants. Integration between HFC and antenna plants can highly reduce the cost of cabling (b) (a)

22 ANCIT WORKSHOP Torino, 30-31 March 1998

23 ANCIT WORKSHOP Torino, 30-31 March 1998

24 ANCIT WORKSHOP Torino, 30-31 March 1998


Download ppt "ANCIT WORKSHOP Torino, 30-31 March 1998. ANCIT WORKSHOP Torino, 30-31 March 1998."

Similar presentations


Ads by Google