Download presentation
Presentation is loading. Please wait.
Published byJessica Ball Modified over 9 years ago
1
PHASED ACTIVITIES AND BASELINE DOC’s FOR UTIILITIES ACQUISITION BULK SERVICE LIF-CYCLE APPROACH IDENTIFICATION & ANALYSIS APPLICABLE TECHNOLOGY / RESEARCH PRELIMINARY STAGEPRE-IMPLEMENTATION STAGEIMPLEMENTATION STAGE MS1 RESIDENTS AND MC NEEDS & REQUIREMENTS DESIGN STANDARDS MS2 FEASIBILITY STUDY DETAIL DESIGN TENDER PROCESS CONSTRUCTION / INSTALLATIION COMMIS- SIONING & RETENTION OPERATION & MAINTENANCE SERVICE REQ. BL MS4MS5 MS3MS6 UPGRADING / MODIFICATION INVESTIGATION MS7MS8 % Demographic studies % Socio-economic studies % Land-use studies % Corridor studies % Routing & layout % Environmental studies % Routing & layout % Environmental studies % Geo-technical studies % Hydrological studies % Intermodal transport studies % Masterplan development % Expropriation of land (investigation on macro level) % Stakeholder involvement % Affordability and subsidy study NEED: (GENERAL) PHYSICAL PLANNING AND GPMC REQUIREMENTS / SERVICE DEFINITION Applicable and viable technology results STRUCTURE / DEVELOPMENT PLAN MASTER PLANS (BULK SERVICES) (RECENTLY UPDATED; AUTHORISATION FOR PROJECT): % Sewerage % Electricity % Solid waste % Water % Roads and Stormwater % Cemeteries % Sport grounds % Emergency services % Libraries % Houses, etc. UTILITY REQ. BL UTILITY SYST. FUNC. BL UTILITY PROC. BL UTILITY DET. DES. BL UTILITY AS BUILT BL 1 UTILITY AS BUILT BL 2 UTILITY AS & M BL Refer para 3.2.1 service demand CURRENT TO 30 YEARS % Daily demand % Peak demand % Intermodal facility demand RESIDENT VALUE SYSTEM % Comfort % Convenience % Safety % Security % Affordability GPMC TECHNOLOGY CONCEPTS % Upgrade % Modification SUB-STRUCTURE OPERATIONAL CONCEPTS % Security % Safety % Client services % Information % Maintenance % Cleaning LABOUR BASED ACTIVITIES PROJECT EXECUTION % Turn key % Labour based % Emergency contractors STAKEHOLDER INVOLVEMENT STRATEGY BUDGET MOTIVATION % Goals % Target dates Project Req. Statement (as per para 3.2.1 policy doc. FUNCTIONAL DESIGN: CONCEPTS WHICH CONFORM TO: % 30 year demand % Service requirements % Operational concepts % Upgrade strategy % Trade-off studies -30 year life-cycle costs -Cost-effectiveness SPECIFICATIONS: % System spec. % Functional layout drawings STANDARDS OPERATIONS AND MAINTENANCE PLANNING UPDATE REPORTS % Demographic studies % Socio-economic studies % Land-use studies % Transport studies % Corridor studies % Commuter studies % Routing & Layout % Environmental studies % Geo-technical studies % Hydrological studies % Services availability % Expropriation of land % Intermodal transport studies % Affordability and subsidy study % Stakeholder involvement % Conceptual design for construction method PRELIMINARY (OR BASIC PLANNING) DESIGN REPORT: -affordability in terms of available capital for commissioning and operation -Functionality -Environmental impact -Integer. With exist. Systems -Value for money -Client satisfaction -Economic life Detail architectural design Engineering design Structural design Electrical design Mechanical design Surveying Civil design GPMC / SS furnished item / product integration Service integration Integration Detail; specification Quantity surveying Operations and maintenance development Metro furnished item procurement planning Training plans Tender documents Design correspondence Design report Adjudication of tender documentation Tender report Construction GPMC / SS furnished item procurement and installation Testing Commissioning plan Procurement of operations and maintenance facilities and equipment Operations and maintenance planning Start-up planning Minutes Correspondence Completion reports As-built drawings Maintenance manual Operations manual Start-up plan Start-upOPS: Data Logging Maint: Data logging Cost: Data logging Service Audit Completion certificates MANAGEMENT INFORMATION: % Ops. Report % Maintenance report % Cost report Upgrade / Modification needs report SAACE Project Management Rev 4 Project Management Rev 3 Project Management Rev 5 Project Management Rev 6 Project Management Rev 2 Goals and budgets programme plan (K1 / K2) Project management Rev 1 (refer para 4.3) MC STRATEGIC PLANNING % Purpose % Goals % Objectives % Sub objectives
3
BULK SERVICE LIFE-CYCLE APPROACH: TECHNICAL REVIEWS BULK-SERVICE IDENTIFICATION & ANALYSIS PHASE APPLICABLE TECHNOLOGY / RESEARCH PHASE PRELIMINARY STAGEPRE-IMPLEMENTATION STAGE IMPLEMENTATION STAGE MS1 PROJECT BRIEF: RESIDENT AND MC NEEDS & REQUIREMENTS DESIGN STANDARDS PHASE MS2 FEASIBILITY STUDY PHASE DETAIL DESIGN PHASE TENDER PHASE CONSTRUCTION / INSTALLATIION PHASE COMMIS- SIONING PHASE OPERATION & MAINTENANCE PHASE SERVICE REQ. BL MS4MS5MS3 MS6 UPGRADING / MODIFICATION INVESTIGATION PHASE MS7MS8 UTILITY REQ. BL UTILITY SYST. FUNC. BL UTILITY PROC. BL UTILITY DET. DES. BL SERVICE REQUIREMENTS REVIEW Warranty & retention management UTILITY AS BUILT BL 1 UTILITY AS BUILT BL 2 UTILITY AS B & M BL PHASE OUT PHASE MS9 END OF LIFE BL PROJECT REQUIREMENTS REVIEW UTILITY SYSTEM DESIGN REVIEW PRELIMINARY DESIGN REVIEW CRITICAL DESIGN REVIEW TENDER ALLOCATION REVIEW PRELIMINARY QUALIFICATION REVIEW FORMAL QUALIFICATION REVIEW
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.