Download presentation
Presentation is loading. Please wait.
Published byDelphia Thompson Modified over 8 years ago
1
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002
2
2New York Independent System Operator ISO Load Forecast Issues NYISO - PJM Interface DAM Scheduling Transmission Constrained Operation #91 Leeds-Pleasant Valley maintenance outage Significant generating unit maintenance outage Generator Operating Capability ISO Operations Actions Follow-up
3
3New York Independent System Operator Load Forecast Issues No prior historical basis for April 16-19 weather/loads Weather forecast error (5.8%) Statewide load forecast model error (5.2%) Average peak forecast error (2500MW) Forecast model updated based on April 2002 loads
4
4New York Independent System Operator NYISO - PJM DAM Scheduling SCUC modeling normally forces all NYISO-PJM transactions to flow across NY- PJM interconnections High exports from IMO and NYISO to PJM resulted in a portion of transaction (loop) flow around Lake Erie SCUC exceeded normal NYISO-PJM scheduling capability (2500MW)
5
5New York Independent System Operator Transmission Constrained Operation # 91 Leeds-Pleasant Valley 345kV line scheduled out for Athens substation work #92 Leeds-Pleasant Valley 345kV line de-rated from seasonal winter capability to account for high 90+ degree temperatures Declared Emergency Transfer Criteria operation for #92 Leeds- Pleasant Valley 345kV line SCD/BME indicated the ability to secure the # 91 line constraint based on as-bid generator capabilities
6
6New York Independent System Operator Unavailable Generator Capability BME/SCD considered as-bid unit capability that apparently could not be achieved in-day Significant difference in on-dispatch generator bids vs. actual unit output (400 - 800 MW) Some generator capabilities reflected Winter seasonal ICAP values and not in-day operating capabilities Generators expected to de-rate or adjust bids to reflect actual operating capability
7
7New York Independent System Operator Operator Actions to Maintain Reliability Used SRE to commit additional units in response to forecast error Declared Emergency Transfer Criteria for #92 Leeds-Pleasant Valley constraint Units required OOM since actual operating capabilities were insufficient to secure #92 Leeds-Pleasant Valley constraint and were not reflected in BME/SCD schedules Units required OOM since actual operating capabilities were insufficient to meet reserve requirements and were not reflected in BME/SCD schedules Export transactions curtailed to maintain reserves Maintained high levels of import transactions from ISO-NE
8
8New York Independent System Operator Follow-up issues Address generator owner bidding concerns of ICAP requirements vs. actual in-day operating capability (Reliability and Pricing Impacts) Propose GT Resources taken OOM for ISO Reserves be eligible to participate in price setting pass of hybrid dispatch Enhance Control Room GT management tools
9
9New York Independent System Operator Follow-up issues continued: Review SCUC and BME Load Forecast Procedures Discuss potential solutions with ISO Business Issues and Operating Committees
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.