Presentation is loading. Please wait.

Presentation is loading. Please wait.

Industrial Engineering Department S UMMER T RAINING P REPARED BY : E NG. I BRAHIM K UHAIL.

Similar presentations


Presentation on theme: "Industrial Engineering Department S UMMER T RAINING P REPARED BY : E NG. I BRAHIM K UHAIL."— Presentation transcript:

1 Industrial Engineering Department S UMMER T RAINING P REPARED BY : E NG. I BRAHIM K UHAIL

2 O UTLINE NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 S UMMER T RAINING Summer Training Objective 1 Summer Training Requirements 2 Summer Training Plan 3 Fields of Training 4 Summer Training Deliverables 5 5 6 2

3 S UMMER T RAINING O BJECTIVE NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015S UMMER T RAINING 3

4 S UMMER T RAINING O BJECTIVE  Applying industrial engineering concepts  Applying the problem solving techniques  Adapting to the working environment  Improving the students skills NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 S UMMER T RAINING 4

5 S UMMER T RAINING R EQUIREMENTS NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015S UMMER T RAINING 5

6 S UMMER T RAINING R EQUIREMENTS  The student must finish 130 hours before the training.  Training period: 8 weeks, starting on Saturay 3/7/2010 and ending on Thursday 26/8/2010:  The student should prepare a weekly progress reportprogress report  The student should submit a final report and a power point presentation to be held immediately after the conclusion of the training  The student should reflect the IUG policies in the training facility  Supervisor will visit the student at least twice during the training period NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 S UMMER T RAINING 6

7 S UMMER T RAINING P LAN NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015S UMMER T RAINING 7

8 S UMMER T RAINING P LAN  First week :  About Company: Mission, Vision, Staff, and Establishment.  Assessment Study: Needs and Problems.  Second week :  Scope of Work: Firm name, sector, Location, Duration of training, Purpose of training, Planned activities, Deliverables ( Study, Models,.....) NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 S UMMER T RAINING 8

9 S UMMER T RAINING P LAN C ONT.  Third to Eighth weeks:  Beginning of activities and schedule of tasks.  Identifying the firm departments.  At the end of Eighth weeks  Final Report and presentation submission. NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 S UMMER T RAINING 9

10 F IELDS OF T RAINING NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015S UMMER T RAINING 10

11 F IELDS OF T RAINING  Facility Layout and Material Handling.  Ergonomics and Human Factors.  Engineering Economy “ Feasibility Study”  Manufacturing  Quality Control.  Production and Operations Management.  Safety and Maintenance.  Design of Experiments.  Simulation. NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 S UMMER T RAINING 11

12 T ENTATIVE T RAINING F IRMS NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 12 S UMMER T RAINING

13 S UMMER T RAINING D ELIVERABLES NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015S UMMER T RAINING 13

14 S UMMER T RAINING D ELIVERABLES  New Layout, Re-design of layout  Ergonomic study  Feasibility Study  Control charts  MRP, MPS, ERP, Work flow map NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015 S UMMER T RAINING 14

15 A NY Q UESTION ? NOVEMBER 2, 2015 NOVEMBER 2, 2015 NOVEMBER 2, 2015S UMMER T RAINING 15


Download ppt "Industrial Engineering Department S UMMER T RAINING P REPARED BY : E NG. I BRAHIM K UHAIL."

Similar presentations


Ads by Google