1 FEBRUARY 28, 2008 SCHOOL BUILDING PROJECT UPDATE

2 School Building Committee Members Lee Storrs, Chair Christy Barbee Bob Pauplis Bill Risso Don Rober Wendell Sykes, Vice-Chair Ingo Szegvari Marie Doyle, Superintendent Heidi Zimmerman, School Business Manager

3 A Brief History 2001 Feasibility Study  Plan withdrawn  Concerns over two campuses 2003 Feasibility Study  Plan shelved  State funding moratorium 2005 Master Plan  Three options proposed by Architects  Long term planning document

4 Role of the MSBA “Responsible for management, financing, and auditing” of school building projects Protect the taxpayer’s dollar Looking to partner with communities to build “right size” projects Newly-created authority in early stages of funding new projects

5 MSBA Update 2005/2006  MSBA performs needs assessment on all schools  Rates Spalding a “4” (worst), ranks it a high priority 2006/2007  SBC submits Statement of Interest to MSBA  MSBA visited CPS for Senior Study and Facilities Assessment Winter 2007/08  Carlisle receives feasibility invitation  Carlisle representatives meet with MSBA  MSBA projects 40% project reimbursement  MSBA gives nod to Master Plan as basis for moving forward Spring 2008  Provide town data for MSBA enrollment projections  Meet with Selectmen on project planning  Extend SBC per MSBA specs

6 Next Steps – Short Term Feasibility Study Agreement with MSBA Hire Owner’s Project Manager (OPM)  Required by state for public building projects  Represents Carlisle’s interests during entire process Hire Architect to develop schematic design  Preliminary layout  Conceptual drawings  Estimate of project costs

7 Long Term Complete Feasibility Study Finalize Scope and Budget with MSBA Appropriate funds within 120 days Detailed project design (approx 1 year) Construction (approx 2 years)

8 What Can You Do? Keep informed  Attend meetings: SBC, Selectmen, FinCom, etc.  Read available documents  http://www.carlisle.mec.edu/district/business/FacilitiesMasterPlan.pdf http://www.carlisle.mec.edu/district/business/FacilitiesMasterPlan.pdf  http://info.massschoolbuildings.org/SOI_List/ShowSOI.aspx  Read The Buzz and The Mosquito Voice your opinion NOW – early in the process Talk to your friends and neighbors Attend Town Meeting and Vote

9 QUESTIONS AND COMMENTS