1 “Where America’s Climate, Weather and Ocean Services Begin” FY16 Production Suite Plans Rebecca Cosgrove Chief, Production Management Branch, NCO August.

Similar presentations


Presentation on theme: "1 “Where America’s Climate, Weather and Ocean Services Begin” FY16 Production Suite Plans Rebecca Cosgrove Chief, Production Management Branch, NCO August."— Presentation transcript:

1 1 “Where America’s Climate, Weather and Ocean Services Begin” FY16 Production Suite Plans Rebecca Cosgrove Chief, Production Management Branch, NCO August 4, 2015

2 WCOSS and the NCEP Production Suite Planning Process:  Quad charts with model upgrade scope, schedule and issues/risks for the next 12 months presented to the NCEP Director and other Senior Management quarterly  Developers submit estimated compute requirements for upgrades and they are mapped into holistic NCEP Production Suite view WCOSS System Details:  Phase 1 IBM iDataPlex System:  620 compute nodes  Phase 2 IBM iDataPlex System:  1080 compute nodes  Task Order 4 Cray System:  2048 compute nodes 2

3 High Water Mark Charts (HWM)  Total system utilization by model over the day  Each set of nodes (P1,P2,TO4) has a unique HWM chart because resources are not interchangeable  Operational NCEP Production Suite comes up from the bottom, test jobs drop down from the top  Limitations:  Can only assign shared node usage to one application, resulting in some underreporting 3

4 4 Production Machine HRRR GEFS Phase 2 Phase 1 HIRESW HWRF (6 storms) SREF CFS RTOFS HWRF (5 storms)

5 ECMWF-based Model Output Statistics (MOS) High-Resolution Window (HIRESW) Short Range Ensemble Forecast System (SREF) Global Ensemble Forecast System(GEFS) NHC Guidance Suite Real-Time Ocean Forecast System (RTOFS) Global CPC International Grids AWC Graphical Turbulence Guidance Community Multi-scale Air Quality (CMAQ) model Extra-Tropical Storm Surge (ETSS) Climate Forecast System (CFS) GFS-based MOS (Sandy project) and NAM-based MOS Gridded Lamp Global Wave Model Near-shore Wave Prediction System (NWPS) RTOFS Atlantic FY15 Q4 Implementations Indicates Sandy Supplemental Project

6 Node Usage at end of FY2015 Quarter 4 GEFS Legacy GEFS SREF HWRF HIRESW RTOFS NWPS has stripe of 4 nodes Phase 2 Phase 1

7 Space Weather Prediction Center(SWPC) Geospace Model North American Mesoscale (NAM) Forecast System Real-Time Mesoscale Analysis (RTMA) National Blend Rapid Refresh Model (RAP) National Ocean Service (NOS) Regional Ocean Modeling System (ROMS) High-Resolution Rapid Refresh (HRRR) Global Wave Ensemble (GWES) NEMS GFS Aerosol Component (NGAC) NCEP-FNMOC Combined Wave Ensemble (NFCENS) North American Ensemble Forecast System (NAEFS) Hybrid Single Particle Lagrangian Integrated Trajectory (HYSPLIT) Climate Calibrated Precipitation Analysis (CCPA) FY16 Q1 Implementations Indicates Sandy Supplemental Project

8 Node Usage at end of FY2016 Quarter 1 GEFS Legacy CFS Wave Ensemble SREF GFS NAM HWRF NAMRR HRRR GDAS GEFS GEFS LEG HIRES NWPS has stripe of 4 nodes Geospace has stripe of 6 nodes Phase 2 Phase 1

9 9 Global Forecast System (GFS)** GFS-based MOS** Probabilistic Extra-tropical Storm Surge (P-ETSS) and Extra-tropical Storm Surge (ETSS) Great Lakes Wave (GLW) Great Lakes Operational Forecast System (GLOFS) North American Land Data Assimilation System (NLDAS) NAM-based MOS RTOFS Global FY16 Q2 Implementations Indicates Sandy Supplemental Project **Moved from previous quarter

10 Node Usage at end of FY2016 Quarter 2 CFS Task Order 4 Phase 2 Phase 1

11 11 Weather Research and Forecasting Hydrological Modeling Extension (WRF-Hydro) Probabilistic Storm Surge (PSURGE) Hurricane Storm Surge Operational Forecast System (HSSOFS) Gridded LAMP NAEFS Hurricane Weather Research and Forecasting (HWRF) FY16 Q3 Implementations *Initial list Indicates Sandy Supplemental Project

12 Node Usage at end of FY2016 Quarter 3 CFS HWRF WRF-HYDRO HSSOFS PSURGE Task Order 4 Phase 2 Phase 1