Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1.

Similar presentations


Presentation on theme: "Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1."— Presentation transcript:

1 Beam Secondary Shower Acquisition System: ICECAL Board design, Preliminary Pictures Student Meeting Jose Luis Sirvent PhD. Student 07/07/2014 1

2 1.Board Concept Front-end Acquisiton Board for Secondaries (FABS) 2 POWER STAGE VTRX IGLOO2 Dev.Kit GPIO Header Power Connector ADC ADS5272 SMA TX_P SMA TX_N SMA RX_P SMA RX_N ICECAL CH_1 ICECAL CH_2P ICECAL CH_2N Genera IN_1 Genera IN2 Single to Differential Single to Differential ICECAL CH_2 Clock Conditioning ICECAL CH_1P ICECAL CH_1N ICECAL I_Bias Circuits

3 LHC_PIPE 3 BWS pCVD SCINTILLATOR PMT Splitter Power Adapters 2.Why we do this? Development of first prototype for proof-of-concept evaluation

4 3. Our Resources for this board: Original ICECAL_V2 Test-Board schematics I’ve been in contact with ICECAL’s main designers: Eduardo Picatoste & David Gascón ICECAL is a serious candidate to our system since is the natural evolution of the Readout ASIC we´re using now in the surface. The designers kindly provided 2 x ICECAL_V2 samples, schematics of their test board and many useful advices. (Thanks guys!) Version 2  1 Channel, no multiplexer, no I_Bias Cirquits, no ADC Driver, no Delay line, but useful for our prototype. Version 3  4 Channels with everything included (Smaller test board needed). Soon under evaluation. The task I’m carrying out: I’ll modify their test board to our needs. Lars also provided the schematics of his VTRX adapter module (Custom SFP-HSMC Adapter Board) https://indico.cern.ch/event/284352/ https://indico.cern.ch/event/284352/

5 5 4. A quick look at some modifications

6 6

7 7

8 8

9 9 ICECAL_CH2 ADC 2X Single to Differential I_Bias Circuit 5. Routing Status so far: (A general overview) Linear Regulators Bank

10 10 5. Routing Status so far: (Linear regulators bank)

11 11 5. Routing Status so far: (3d View)

12 Voltage Regulators: TL1963-KTT  Qualified up to 1KGy by PSI for MOPOS [1,3] Analogue to Digital Converter : ADS5272  Total TID 88KGy for ATLAS, teted at IUCF / LANSCE WNR [2] Differential operationals (Gen. Inputs):THS4521  Qualified up to 1KGy by PSI for MOPOS [1,3] Readout ASIC:ICECAL_V2  RadHard development Programmable Delay Lines:3D3418  Total TID 5Krad [4] Rail-to-Rail Comparators LT1711  Not Qualified (ICECAL Clock conditioning) LVDS _CMOS Receiver DS90LV048A  Tested with 60MeV p beam up. Qualified up to TID = 0.7KGy [6] (ADC Clock Conditioning) Bias Operationals (I_BIAS Circuit) OPA602  Tested up to 2.7KGy (Neutrons), but not qualified [5] Dual Current Source / Current SinkREF200  Not Qualified There are some additional components to add to this list [1] C. Deplano ∗, J. Albertone, T. Bogey, J. L. Gonzalez, J. J. Savioz RADIATION RESISTANCE TESTING OF COMMERCIAL COMPONENTS FOR THE NEW SPS BEAM POSITION MEASUREMENT SYSTEM. CERN, Geneva, SwitzerlandRADIATION RESISTANCE TESTING OF COMMERCIAL COMPONENTS FOR THE NEW SPS BEAM POSITION MEASUREMENT SYSTEM [2] Helio TAKAI. Characterization of COTS ADC radiation properties for ATLAS LAr calorimeter readout upgrade. TWEPP13, 23-27 September 2013Characterization of COTS ADC radiation properties for ATLAS LAr calorimeter readout upgrade [3] J.Albertone, T.Bogey, C.Delplano, J.L. Gonzalez. Logarithmic Amplifiers, ADC Drivers and Voltage Regulators: Radiation Test Report at PSI-PIF. 2013Logarithmic Amplifiers, ADC Drivers and Voltage Regulators: Radiation Test Report at PSI-PIF [4] J. Gu. EMU DAQ MotherBoard. ERS, CERN Nov. 2013.EMU DAQ MotherBoard [5] F. J. Franco, Y. Zong, Juan Casas-Cubillos, M. A. Rodríguez-Ruiz, and J. A. Agapito. Neutron Effects on Short Circuit Currents of Op Amps and Consequences. IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 52, NO. 5, OCTOBER 2005. Neutron Effects on Short Circuit Currents of Op Amps and Consequences [6] G. Di Mattia Thesis. Test del funzionamento e della resistenza alle radiazioni dell’elettronica per il trigger di primo livello dell’esperimento ATLAS. Università degli Studi di RomaTest del funzionamento e della resistenza alle radiazioni dell’elettronica per il trigger di primo livello dell’esperimento ATLAS “La Sapienza” 12 6. Considering radiation: Components and Qualifications