IT 21103/41103-01 System Analysis & Design
2
Chapter 02 Project Initiation
3
Analyst Role Problem Solver
4
First Steps “What is the Problem?” Define the Real Problem
5
Information Relevancy Usefulness of system outputs Users need to be consulted
6
Information Accuracy Concerned with System Errors Develop an Error Threshold
7
Information Timeliness Problems with information availability I/O Bottlenecks Time causes erosion of the system processing speed
8
Information Usability Information Packaging Tailor information to fit the user’s needs
9
Information Affordability Opportunity Costs Actual Costs Persistent Upgrades or High Maintenance
10
Information Adaptability Flexibility in Hardware and Software expandability and compatibility Users will abandon unused portions of the system
11
Information Accessibility Users interaction with the system Internet & Intranets Depends on the type of user
12
Solutions Page 37 Figure 2-2
13
Small Enterprise Problems Source Data Input Inefficiencies Breakdowns in Subsystem Integration
14
Small Enterprise Problems Source Data Input Inefficiencies How the data is entered into the system A major problem
15
Small Enterprise Problems Breakdowns in Subsystem Integration Many subsystems functioning together logically
16
Fact-Finding The Analyst must do Research about the information system they are to examine
17
Fact-Finding Industry Research Journals, Magazines, Libraries, State/Federal Agencies, Professional Organizations, etc
18
Fact-Finding Online Research Search Engines (Google), etc
19
Fact-Finding Personal Contacts Personal Interviews Questionnaires On-Site Observations
20
Fact-Finding Page 43
21
Fact-Finding Request for Services Very Important to get in writing what the user wants! Page 44
22
Fact-Finding Documentation Review Collect samples of source and output documents of the current system
23
Feasibility Analysis A ballpark estimate of what the project will cost and how long it will take to complete An Estimate Only
24
Feasibility Analysis Four Components: OperationalTechnicalScheduleEconomic
25
Feasibility Analysis Operational: Is there a workable design for the intended system
26
Feasibility Analysis Technical: Is there technology available to make the system work
27
Feasibility Analysis Schedule: Can the project be completed within the agreed timeframe
28
Feasibility Analysis Economic: Can the project be completed within the budget constraints
29
Feasibility Analysis Build-Or-Buy This is a strategy to determine if building a system or buying a pre- built system is most feasible
30
Feasibility Analysis Documentation: Page 47
31
Feasibility Analysis Feasibility Report: A project deliverable A common point of reference for negotiations
32
Feasibility Analysis Project Contract: Clear agreement about the work to be done for the project (Modifications may occur)
33
Feasibility Analysis Project Contract: Problem Summary ScopeConstraintsObjectives
34
Feasibility Analysis Problem Summary: Concise statement including the user’s original request and the preliminary findings of the analyst (The Analyst and Users must agree)
35
Feasibility Analysis Scope: Agreement on the boundaries of the work to be done Agree on changes that may occur during the project
36
Feasibility Analysis Project Constraints: CostsDelivery Access to the current system and users Unusual circumstances
37
Feasibility Analysis Project Objectives: Agreement on the consequences of the new system What is the measurement of success (Develop a Baseline measurement)
38
Questions
39
Assignment # 02 Page 59 Appendix B