OP Transport 2007 – 2013 and JASPERS Ministry of Transport
2
Managing Authority:Ministry of Transport Allocation:5 759,08 mil. EUR Cohesion Fund:4 603,64 mil. EUR ERDF:1 155,44 mil. EUR OP Transport
3
Priority 1 - Upgrading the TEN- T Railway Network Priority 4 - Upgrading 1st Class Roads outside the TEN-T Upgrading and Development of the Motorway and Road TEN-T Network Priority 2 - Construction and Upgrading of the Motorway and Road TEN-T Network Upgrading and Development of the Railway Network outside of TEN-T Reconstruction and Upgrading of 1 st Class Roads outside of TEN-T Development and Upgrading of Inland Waterways in and outside of the TEN-T Network, Upgrading River Vessels in order to Reduce the Adverse Environmental Impact of Transport Upgrading and Development of Railway Lines in the TEN-T Network Priority 3 - Upgrading Railway Networks outside the TEN- T Priority 6 – Support of Multimodal Transport and Network and Construction and Upgrading of Inland Waterways Development of the Underground Network in Prague Introduction of Road Traffic Management and Regulation Systems in Prague Support for Multimodal Freight Transport, The Development of Intelligent Transport Systems in Road Transport, and of Systems Improving Road Traffic Safety and Flow Priority 7 Technical Assistance - CF Priority 8 Technical Assistance - ERDF Priority 5 - Upgrading and Development of the Prague Underground and Systems for the Management of Road Transport in the City of Prague Ensuring Interoperability on Existing Railway Lines, Ensuring Compliance with Technical Specifications for Interoperability (TSI), and the Development of Telematic Systems OP Transport – priority axes
4
Allocations – TEN-T/other
5
FundAllocation Priority 1 (rail TEN-T)CF1 610,18 Priority 2 (road TEN-T)CF1 855,92 Priority 3 (rail non TEN-T) CF749,26 Priority 4 (road non TEN-T)ERDF860,98 Priority 5 (Prague metro) CF300,20 Priority 6 (multimodal tr. and waterways) ERDF270,68 Priority 7 (TA) CF88,14 Priority 8 (TA) ERDF23,78 TotalCF + ERDF5 759,08 Allocations (mil. EUR)
6
Cohesion Fund Upgrading and Development of Railway Lines in the TEN-T Network Ensuring Interoperability on Existing Railway Lines, Ensuring Compliance with Technical Specifications for Interoperability (TSI), and the Development of Telematic Systems Priority 1 – Modernisation of railways TEN-T
8
Cohesion Fund Upgrading and Development of the Motorway and Road TEN-T Network Development of Intelligent Transport Systems in Road Transport, and of Systems Improving Road Traffic Safety and Flow Priority 2 - Construction and Upgrading of the Motorway and Road TEN-T Network
10
Cohesion Fund Upgrading and Development of the Railway Network outside of TEN-T Priority 3 - Modernisation of railway outside the TEN-T
11
ERDF Reconstruction and Upgrading of 1st Class Roads outside of TEN-T Priority 4 – Upgrading 1st Class Roads outside the TEN-T
12
Cohesion Fund Development of the Underground Network in Prague Introduction of Road Traffic Management and Regulation Systems in Prague Priority 5 – Upgrading and Development of the Prague Underground and Systems for the Management of Road Transport in the City of Prague
13
ERDF (Czech Republic excluding Prague) Support for Multimodal Freight Transport Development and Upgrading of Inland Waterways in and outside of the TEN-T Network, Upgrading River Vessels in order to Reduce the Adverse Environmental Impact of Transport Priority 6 – Support of Multimodal Transport and Construction and Upgrading of Inland Waterways
15
JASPERS - TOP PRIORITIES The control of completeness and correctness of Feasibility Study for the Third Transit Railway Corridor. Afterwards the control of completeness and correctness of Cohesion Fund project Application and control of draft conditions for the tender for project located in this corridor - Planá u Mariánských Lázní – Cheb. – AP 2006, Priority Axis 1 OPT The control of completeness and correctness of Feasibility Study for the Fourth Transit Railway Corridor. Afterwards the control of completeness and correctness of Cohesion Fund project Application and control of draft conditions for the tender for project located in this corridor – Benešov – Stránčice (AP 2006), Priority Axis 1 OPT Construction of Radio Digital Network (GSM – R) Kolín – Břeclav –State border, Priority Axis 1 OPT
16
Need of coordination Project applications already under preparation EC approval of OP Transport expected in second quarter 2007 Formal submission of applications - end of 1st q. 2007 => We have to establish reasonable time schedule to provide RIA time for proper preparation of final applications
17
www.mdcr.cz