Presentation is loading. Please wait.

Presentation is loading. Please wait.

Connected Community for Project Visualization, Management and Collaboration.

Similar presentations


Presentation on theme: "Connected Community for Project Visualization, Management and Collaboration."— Presentation transcript:

1 Connected Community for Project Visualization, Management and Collaboration

2 Plan for presentation – LIVE DEMO Plan would be to show live demos – ppt’s just showing what I would show and for others to understand the flows> 1.TCC Site from Dimensions – using base data, renamed and have a Site ready for Con-Expo 2.If we have two monitors – it worked well at Dimensions to show the ppt on one monitor and Live Software on the other. If only one monitor – my preference would be for the live demo

3 Connected Site Workflow Job Site Workflow – First Phase Bid phase Site reconnaissance Site reconnaissance follow-up Production Job Site Progress -- Next Session Operations Where are we in the schedule? What’s been completed? Project Closure

4 Communications  Microwave brings Internet onto site  Wireless Bridges move Internet access to key locations  Wireless Bridges connect to SNM920’s  SNM920’s provide local internet in trailers & connection to Bullets or Rajants  Bullets or Rajants provide WIFI coverage outside

5 Communications  Saxnet is an alternative to Microwave for internet  Saxnet brings in Internet over cellular  Hard wired cable would be a third option for Internet

6 File Management Forums

7 Site Reconnaissance  Where are the existing power and utilities  What does the site look like?  Where are the vehicle access points?  Where will we get internet access?  Where will we put our base stations?  Which communication tools will we use?

8  Trailers set up; Communications outlined  Ready to get Site Topo’s  Tools available: –Trimble Data Collectors  TSC2s, TSC3’s, Trimble Tablets, TCA1s  SCS900 / SCS700 Data Manager Site Reconnaissance – Follow up

9  We selected the TCA1 (SCS700, Camera, Trips)  Site Topo’s Uploaded Using TCC Sync  Used Visual Organizer to Display: Control Points Designs Work Orders  Using Trip Manager – we took images of control points and/or troublesome areas  Site Images were captured and emailed into the community  Enhanced the data using BC-HCE Site Reconnaissance – Follow up

10 Display, Review and Share Designs  Site topo’s using  TSC2, TCA1, Trimble Tablet  SCS700 and Connected Community Sync Brought in: Control Points Designs Work Orders Inspections Site Images

11 Business Center-HCE Publish Design  Import Data from the SCS900  Create Surface Models  Capture 2D Images for Overlay  Capture 3D Images  Generate Cut and Fill Maps  Publish Complete Project for Sharing to the Connected Community

12 Cut and Fill  Created in BC-HCE and Published to TCC  Weekly Cut and Fill Map  Track progress to projections

13 Tracker: Track Resources, People and Devices  Where are my assets?  Where are the field crews?  What devices are not being used?

14 Display using the GeoPicture Viewer  Take site photos and upload  Know what your site looks like  Share data with others

15 Operations  Assets and vehicles tracked  People and resources tracked – snapshot of where everyone is located  Daily web cams  Top soil removed  Cut and fill maps  Electrical, power and internet access  Tents

16 VisionLink™  Where are my assets?  What vehicles are not being used?  Can I relocate assets to another project?

17 Web Cams Install Web Cams for Site Access from Back in the Office Real Time Data Streaming

18 Thank You


Download ppt "Connected Community for Project Visualization, Management and Collaboration."

Similar presentations


Ads by Google