Download presentation
Presentation is loading. Please wait.
Published bySharleen Manning Modified over 8 years ago
1
MIECF 2014 Advancements in Water Reuse in Western Australia Presented by Ashley Vincent General Manager Planning and Capability Group Water Corporation of Western Australia
2
One third of Australia’s land mass North of the State – Hot, wet, sparsely populated South of the State – Warm, moderate winter rainfalls Perth – Capital city – 1.9 million people Western Australia
3
Inflow to Perth Dams
4
Summer 2013/4 – Hot and Dry Perth
5
Water Forever Whatever The Weather
6
Looking Forward % IWSS Sources - 2012 % IWSS Sources - 2022
7
Water Recycling Journey Before 1990’s2000’s2010’s2020’s 2004 – Kwinana Water Recycling Plant 2010 - GWR trial begins Today 2022 - Full GWR Expansion 1950’s – Merredin 1992 – Albany Tree Farm 2009 – Onsite recycling 2014 – Mulataga Recycling scheme 2003 – McGillivray Oval 2000’s – Multiple regional recycling irrigation schemes 2016 – GWR Stage 1
8
Increasing Water Recycling
9
Groundwater Replenishment Trial Objectives Technical feasibility Policy and regulation Community engagement and discussion
10
Treatment Train Wastewater Treatment Water suitable for discharge to ocean Ultrafiltration – Removes: All suspended solids Crypto, giardia, all bacteria Larger virus Reverse Osmosis – Removes: All viruses All chemicals larger than a water molecule Ultraviolet Treatment Final disinfection step Guarantee of bacteria and virus removal 224 1 4
11
Groundwater Investigations Objectives Distance travelled Pressure effects Geochemical changes Water Quality 22 Monitoring Bores Background: Jan 09 – Oct 10 Ongoing sampling Online monitoring: level, pH, conductivity Geochemistry & geophysical investigations Research & Technical Reference Partners CSIRO & Curtin University DoW Hydrogeologists, Rockwater
12
Recharged Water - Distance Travelled (to 31 December 2012)
13
Community Engagement http://www.watercorporation.com.au/
14
Recycled Water for Drinking Dec 2012: Complete GWR Trial Jan 2013: Continue 1.5GL recharge to Dec 14 Stage One: 7GL pa Jun 2012: Planning & Construction Jun 2016: Recharge & abstraction Stage Two: +7 – 14 GL pa Aug 2016: Construction start Jun 2018: Recharge & abstraction Stage Three: 7 – 14 GL pa Aug 2020: Construction start Jun 2022: Recharge & abstraction
15
Recycling – Part of our Water Future
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.