2 Human Factors for the London Underground Fit for the Future Stations (FftFS) Nigel ScardHuman Factors Engineer
3
Overview The Fit for the Future Stations (FftFS) programme HF input to FftFS Built Environment –Staff Seat –Customer Receptions –Visitor Centres Conclusions 3
4
The FftFS programme A programme of change Transformation in Customer Service –Redeployment of staff from back offices into public areas to provide assistance to customers where it is demanded –Streamlining of admin tasks Mobile devices for staff Built Environment 4
5
FftFS Built Environment Changes to physical infrastructure at stations Station lighting concepts Well demarcated information and ticketing zones Station design idiom New station features –Staff seat –Customer Receptions –Visitor Centres 5
6
6 Halo lighting above ticket machinesInformation zone
7
Staff Seat Facility being proposed Unpaid side of gateline near to information zones 7
8
Evolution of the design concept 8
9
HF aspects of the Staff Seat design Considerable HF input into design process for the Staff Seat Context of use and requirements –Staff must look approachable –Able to use mobile device –Adjustable height –Good sightlines of ticket machines and gatelines 9
10
Seat Height range and footrest height 10
11
Seat pan design 11
12
Customer Reception Busier stations Stand alone reception table in clearly demarcated information zone Staff Seat nearby 12
13
Evolution of the design concept 13
14
Design concept Pegs to rest iPads Slots for information leaflets Facility for use by both staff and customers –Can be used as a self service facility when not staffed Table top will have embedded information 14
15
HF input into design 15
16
Visitor Centres (VCs) Major LU gateway stations, e.g. King’s Cross, Euston, Heathrow 123 Aimed at infrequent visitors e.g. Tourists 16
17
TICs to VCs – TICs look and feel 17
18
HF input into VC counter design 18
19
King’s Cross VC 19
20
Conclusions FftFS - a fundamental change in how customer service is provided at LU stations Transformation will be underpinned by built environment elements Significant involvement of HF, including built environment aspects The HF has had a real impact on the design Positive impact on both the staff and customer experience 20