Windfarms Implementing SPP6 Nick Evans 6 th December 2007
2
Windfarms Implementing SPP6 Appointing an expert consultant Advice on preparing supplementary planning guidance (SPG)
3
SPP6 - Overall Aims “… to enable Scotland to realise its considerable renewable energy potential ” “ Support renewable energy … and.. protect and enhance Scotland ’ s natural and historic environment ” “ Wind farms should be accommodated where the technology can operate efficiently and the environmental and cumulative impacts can be addressed satisfactorily. ”
4
SPP6 published in March 2007 Spatial frameworks for wind farms Jim Mackinnon ’ s letter to Heads of Planning Prepare SPG Guidance plus support by a consultant Background
5
Appointing an expert consultant Why appoint a consultant? Criteria for the appointment Expectations Timing
6
Advice on preparing SPG analysis of existing DPs and SPG Strengths Commitment to rewewables International and national designations Local environmental issues/biodiversity Small scale/community schemes Stakeholder and public involvement
7
Advice on preparing SPG analysis of existing DPs and SPG Issues for advice Broad areas of search Green belts Different designations different policies Grid capacity Noise
8
Windfarms over 20 MW Windfarms below 20 MW Annex A still relevant, but Consider scale of project with scale and character of landscape More flexible approach to designated areas Particularly for community schemes Scope of the SPG
9
Aims of the SPG 1 - Broad areas of search 2 - Areas of significant protection 3 - Criteria to be followed elsewhere
10
The SPG process 1 - Areas of significant protection 2 - Criteria to be followed elsewhere 3 – Outwith the above Broad areas of search
11
Natural heritage designations International designations National designations Green belts Areas where the limit of cumulative impacts have been reached Areas of significant protection
12
Historic environment Regional and local natural heritage areas Tourism and recreational interests Communities Aviation and defence interests Broadcasting installations Criteria for Elsewhere
13
Areas with no significant constraints Locally sensitive areas Project viability Grid capacity Broad areas of search Outwith protected and potentially constrained areas
14
Planning challenge Widespread experience of DPs/SPG SPP6 means a review of DPs/SPG Appointing an expert consultant Advice on preparing supplementary planning guidance (SPG) Conclusions
15
Windfarms Implementing SPP6 Nick Evans 6 th December 2007