1 North Main Street Improvements BID Meeting Wednesday, October 29, 2008

2 Project Team Introductions WisDOT –Bill Bertrand, P.E. – Project Manager –Jill Michaelson, P.E. – Project Supervisor City of Oshkosh, Dept. of Public Works –David Patek, P.E. – Director –Steve Gohde, P.E. – Assistant Director MSA Professional Services – Design Consultants –Mike Statz, P.E. – Project Manager –Jason DiPiazza, P.E. – Project Engineer Ken Saiki Design – Landscape Architects –Shane Bernau –Ken Saiki, A.S.L.A. Heritage Research – Historical Consultants

3 Meeting Agenda Presentation –Project overview Schedule Scope –Project details Geometry Staging Streetscape Open House –Displays Aerial photos Project plan View Typical sections Streetscape elements –Questions and answers With project staff

4 Project Overview - Schedule Public information meeting #2: November 13, 2008 –(60% Design Phase) Submit Final Plans: April, 2009 Construction: 2010 –Full construction season (Spring through Fall)

5 Project Overview Scope Produce construction plans from the LDR Concept Plan

6 Project Overview - Scope Replace the aging infrastructure –Pavement –Curb and gutter –Sidewalk –Utilities Sewer, water etc. –Streetscape Lights, amenities etc. Add safety enhancements –Bump outs etc.

7 Project Details – Limits Fox River Bridge to Irving Avenue Cross streets –Reconstructed to N. Main Street Right-of-Way (typical)

8 Project Details - Geometry Ceape Avenue 2 southbound lanes 1 northbound lane Otter Avenue 2 southbound lanes (south of Otter) 1 northbound lane

9 Project Details - Geometry Algoma Boulevard 2 travel lanes 2 parking lanes 400 Block Bump outs Parking lanes

10 Project Details - Geometry Typical section –Wider sidewalks and terraces –More room for: Pedestrians Trees Street lights Amenities Merchants

11 Project Details - Staging N. Main Street closed during construction Access –Parking lots behind buildings –Pedestrian access to building fronts Cross street traffic –Maintained for some intersections – staged Regular construction progress meetings –Keep businesses informed

12 Project Details - Streetscape

13 Project Details – Streetscape Street trees strategically located in front of building corners, blank walls, and parking lots. Tree grates are used along Main St. with exception of bump out areas Tree layout carefully considers underground utilities, façade signage, signal poles, & light pole layout.

14 Project Details - Streetscape Streetscape incorporates design cues from Opera House Square (LDR plan). Features include half-circle tree pits, brick banding, trash receptacles, bike racks, and benches. Modified street tree planter detail reduces snow plow damage by replacing the raised concrete edge w/ a flush edge. MAIN ST. FLUSH CONCRETE EDGE