Presentation is loading. Please wait.

Presentation is loading. Please wait.

Itzhak Tserruya, BNL, Aug. 11, 20041 Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration.

Similar presentations


Presentation on theme: "Itzhak Tserruya, BNL, Aug. 11, 20041 Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration."— Presentation transcript:

1 Itzhak Tserruya, BNL, Aug. 11, 20041 Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration

2 Itzhak Tserruya, BNL, Aug. 11, 20042 Detector location and size Location: around the beam pipe, occupy space from r=5 cm to r=61 cm. Acceptance (active area larger than central arm acceptance): - in z direction |η| ≤ 0.4 : z = 45cm - in φ direction Δφ = 100 o at r = 55 cm: s = 96 cm Segmentation: - along the beam axis: 2 pieces - along the azimuthal axis: 4 pieces Total: 16 detector elements 23 x 26 cm 2 each

3 Itzhak Tserruya, BNL, Aug. 11, 20043 3d view 1195.8 937.9 629.1

4 Itzhak Tserruya, BNL, Aug. 11, 20044 Half a Detector Z: 629.1 mm X: 937.9 mm Y: 1195.8 mm

5 Itzhak Tserruya, BNL, Aug. 11, 20045 Gas, HV and LV Stainless steel pipes for CF 4 : gas in 1/2”, gas out 1”. + N 2 line. The HBD has a total of 112 SHV HV connectors:  Each ½ detector has 56 SHV HV connectors (28 on the bottom and 28 on the top).  i.e. 7HV per sector. These are supplied by two power supplies through resistive chain.  total of 32 HV cables from the HV rack to the detector. LV (not yet specified)

6 6 Readout Board + Preamps Hybrid Preamps with line drivers ~ ¾” honeycomb Read pads ~ 3x3 cm 2 Preamp signals to shaper + ADC wires GEMs Being developed by BNL Instrumentation Based on IO-535 ± input signal ± 2.5 V output From C. Woody DC meeting 4.14.04 Need almost one full rack for the readout electronics

7 Itzhak Tserruya, BNL, Aug. 11, 20047 Material, weight radiation length The detector box is made of 3/4” thick honeycomb structures sandwiched between two G10 sheets ¼ mm thick. Entrance window: double mylar window 50 μ thick with inter volume flushed with N 2. Total radiation budget of detector box and electronics of about 1.5%. Total weight of app. 5kg per half detector.

8 Itzhak Tserruya, BNL, Aug. 11, 20048 Exploded view (old drawing)

9 Itzhak Tserruya, BNL, Aug. 11, 20049 3d view: detector closed (old drawing)

10 Itzhak Tserruya, BNL, Aug. 11, 200410 3d view: detector opened (old drawing)

11 Itzhak Tserruya, BNL, Aug. 11, 200411 Half a detector (old drawing)


Download ppt "Itzhak Tserruya, BNL, Aug. 11, 20041 Itzhak Tserruya Weizmann Institute, Israel BNL, Upgrades Meeting, Aug. 11, 2004 HBD: Infrastructure and Integration."

Similar presentations


Ads by Google