1
UNCLASSIFIED B UILDING S TRONG 1 LRD – Phase 2C (3 - 30 Days)
2
- State EOC - USACE Office/RFO - Installation Support Base (ISB) LRD HQ - Cincinnati, OH O6 (LRD) LRD FWD - Nashville, TN O7 (LRD CDR), O5 (LRE CDR) RFO TN; Jackson, TN Phase 2C: O6 (LRH CDR) RFO KY; Greenville, KY Phase 2B: O6 (LRL CDR) Phase 2C: O6 (NAD) RFO IN; Indianapolis, IN Phase 2B: O6 (LRC CDR) Phase 2C: O5-O6 (NAD) RFO OH; WPAFB, OH Phase 2B: O5 (LRH) Phase 2C: O5-O6 (NAD) ISB KY; Greenville, KY O6 (NAD), O4-O5 (LRL) ISB TN; Arnold AFB O5 (NAD), O4-O5 (LRP) ISB IN; Grissom AFB Phase 2B: O6 (NAD) Phase 2C: O4-O5 (NAD) ECCV8 MCV1 08 01 HQ USACE FWD - D.C. O6 (LRB CDR) LRD – Phase 2C (3 - 30 Days) ECCV RFI RFI ECCV ECCV MCV RFI ECCV MCV RFI
3
NAB PRT LRD HQ LRH O6LRP PRTLRB PRTLRN O6NAD SP RFO TN RFO TN – Phase 2C (3 - 30 Days) LRD CG
4
LRD HQ LRH O6 LRLLRE LRP PRT LRL O6 + PRTLRD CG LRB PRTNAD SP LRN O6 NAB PRTNAN PRT RFO TN NAD O6 + SPSAS PRTLRH PRT LRC LRB PRT RFO KY RFO KY - Phase 2C (3 - 30 Days)
5
NAD PRT (2)NAD O6NAD SP LRD HQ LRH O6 LRP PRT LRL O6 + PRT LRB PRTNAD SP LRN O6 RFO TN NAD O6 + SPSAS PRT LRH PRT LRB PRT RFO KY NAN PRT NAB PRT LRE LRC O6 LRC NWW PRTLRH PRT RFO IN RFO IN – Phase 2C (3 - 30 Days) LRD CG
6
NAD PRT (2)NAD SPNAD O5-O6 LRD HQ LRH O6 LRLLRE LRP PRT LRL O6 +PRT LRD CG LRB PRTNAD SP LRN O6 NAB PRTNAN PRT RFO TN NAD O6 + SPSAS PRT LRH PRT LRC LRB PRT RFO KY LRH O5 + PRT NAD PRT (2) NAD O6 NAD SP NWW PRT RFO IN LRC O6 LRH PRT RFO OH - Phase 2C (3 - 30 Days) NWW PRT RFO OH
7
UNCLASSIFIED B UILDING S TRONG 7 Mission – Main effort Civil Works assessment and restoration Re-establish commercial navigation on Ohio, Tennessee and Cumberland rivers ESF #3 missions in TN, KY, OH, IN - RFO/EFO are established - PRT deployment Temp emergency power missions throughout NMSZ Fully integrated into TN/KY response capabilities and recovery planning Regional collaboration with State, Federal and industry stakeholders Specified, Implied and Essential Tasks E - Initiate emergency Contracting activities S – Integration with USCG MTRSUs S - Active RSOI procedures I - Perform route clearance missions with debris PRT I – Creation of emergency civil works supplemental funding requests I – Conduct 24/7 operations Movements RFO/EFO establishments LRH – TN RFO NAD – KY RFO NAD – OH RFO NAD – IN RFO PRT Deployments – TN/KY RFO Full integration of NAD support (LRD/Districts/RFOs) LNO Deployments Support to MTSRU Sustainment operations Command, Control, Communication Full integration of NAD’s leadership and support Reorganizational change with TN SEOC, TN RFO, KY SEOC, KY RFO as separate reporting entities to report directly to LRD HQ MTSRU fully established and supported ISBs established and under LRD control State-level integration (District, SEOC, RFO coordination) Long-term Sustainability planning LRD – Phase 2C (3 - 30 Days)
8
UNCLASSIFIED B UILDING S TRONG 8 Constraints 1. WWPC capability gap creating limited ability to acquire generators 2. PRT sustainment/coverage past initial deployment 3.Transition plan for recovery operations from region to national 4.Lack of national navigation priorities 5.Require economy of force/risk management planning– can’t do everything 6.Capability to sustain long-term efforts Gaps/Concerns/Recommendations 1.HQ/LRD - Task force power continues planning with FEMA 2.HQ – Create a ready-reserve plan through ESF 3 Cadres/SMEs SME/Cadres produce and expand PRTs just in time Regional efforts toward on-the-job training IN/OH do not have temp power PRT (low risk) 3.HQ - Addresses national recovery plan in future OPORD 4.HQ/LRD – continued planning and ultimate creation of playbook (navigation center of expertise) 5.HQ/LRD – CDRs need to identify and manage risk 6.HQ/LRD – Required deliberate sustainment planning and new personnel tools and initiatives Schedule - employees Rehired annuitant’s Contractor assistance Just-in-time training LRD – Phase 2C (3 - 30 Days)
9
UNCLASSIFIED B UILDING S TRONG 9 North Atlantic Division support to LRD during NMSZ response 1.Essential for level of response required and sustainability of effort 2.Requires senior leader C2 effort, RFO operations, technical and staff support (LRD and Districts) to navigation and civil works, administrative 3.Fully integrated into response/recovery plans – two Division fight 4.Specified Missions: a)TN SEOC Liaison Cell (NAD CG and support staff) b)KY SEOC C2 c)KY RFO d)OH RFO e)IN RFO f)OH RFO g)TF Recovery (SES) Lead h)TF Civil Works (SES) Lead i)TF Special Projects Lead j)TF ESF #3 Lead k)TF ESF #3, Debris OIC l)LRD G3 and G33(x2) m)ISB (x4) C2
10
UNCLASSIFIED B UILDING S TRONG 10 North Atlantic Division (NAD) support LRD during NMSZ response Rank# Required Location 0-71 TN EOC SES2 LRD G-3 0-65 LRD G-3/RFOs 0-51 LRD G-3/RFOs 0-46 ISBs Civilians86 LRD G-3 Engineers84 LRD Districts Rank# Required Location 0-321 Ft. Leonard Wood Support from school house to support LRD during NMSZ response
11
UNCLASSIFIED B UILDING S TRONG 11 PURPOSE: Conduct a Rehearsal of Concept exercise focusing on navigation on LRD lakes and rivers. FOCUS: Primary focus will be on transportation of commodities (coal, petroleum, grains) across ~400 miles of navigable waterways (Ohio, Tennessee to include the Great Lakes) post 7.6+ magnitude destructive earthquake and related aftershocks while concentrating on port and waterway restoration, bridge and utility obstruction removal and hazardous waste recovery and disposal as well as debris recovery and disposal to include emergency dredging operations to maintain the required navigation channel. SCOPE: Host a half day NMSZ discussion for USACE only with focus NMSZ planning for FY16 through FY 18 in support of FEMAs National – Regional Planning Strategic Intent Host a one (1) day ROC drill for LRD Area of Operations of all major players and organization. Focus on earthquake, preparedness, response, preparedness and recovery activities with focus on Navigation DATE: TBD – Fall 2015 in Cincinnati, Ohio area LRD Fall 2015 NMSZ Navigation Focus Exercise
13
UNCLASSIFIED B UILDING S TRONG 13 Channels - 216 river miles - Loss of width and depth Bridges - 10 bridges Aerial Power - 15 crossings Power Generation - Cumberland City Steam Plant Commercial Docks - One downstream of Barkley - Six upstream of Barkley Tennessee River - Canal at CRM 33 - Loss of pool for 184 miles from Kentucky Dam to Pickwick Landing Dam LRD – Navigation Mission Analysis DistrictFlood Risk Mgmt NavigationOther † Total Buffalo11*02* Chicago01*1 Detroit91010 Huntington3592064 Louisville2015*944* Nashville7**4**010** Pittsburgh1623039 CELRD Total8854*30171* *Include Locks without Dams **Barkley is both FRM and Navigation † Levees & Retention Ponds
14
UNCLASSIFIED B UILDING S TRONG 14 LRD Request for Information (RFIs) to HQ USACE Request LRD be relieved of specified task to provide HQ USACE Power LNO Recommend HQ USACE pre-designate additional DTOS assets to support efforts in TN, KY, IN, and OH US&R and Infrastructure Assessment PRTs integration process Using Debris PRT for Route Clearance Expiration of World Wide Power Contract (WWPC) impact Task and purpose for USACE FWD element Provide guidance for Long-Term Recovery Concept of Operation (post phase 2C ~30 days) Procedure for Battle Captain request – (21 O3’s from Fort Leonard Wood Captain’s Career Course) - Process to request Title 10 (Active Duty/USAR) / FEST teams to support LRD Operations - Use of DOD/NORTHCOM Assets/Habitual Associations - Integration of 416 th TEC, USAR Adjudication of Permanent Cadre/Team Leaders/Assistant Team Leaders/ Local Government Liaisons USACE acreage at projects for joint use as staging area for ARNG/USAR missions Integration of dual status commanders in USACE HQ OPLAN Rules of Engagement (ROE) for earthquake aftershocks Navigation Assessments priority Timeline for updated HQ OPLAN 2010-70 dtd 21 DEC 2010 “USACE Response to a Catastrophic Earthquake in the New Madrid Seismic Zone”