Meeting Agenda 10-07-14 (1)Overview ( 概观 ) (2)Questions from previous week ( 上周遗留问题 ) (3)Overtime Optimization ( 加班工时优化 ) (4)Batch Size Optimization ( 批次大小优化 )
2
(1) Overview Previous Week and Current Week: – Questions from previous weeks. ( 上周遗留问题 ) – Optimization algorithm update. ( 优化更新 ) Tasks in Progress: – Development of GUI and establishing link between SEAS GUI and algorithm. ( 介面跟算法之间的连接 ) – Input Sheet creation. – Scenarios for December meeting.
3
(2) Previous week questions MATLAB and VBA Bridge (MATLAB 和 VBA 的连 接 ) Loading and unloading situation from the proposed schedule. ( 排程中卸上卸下问题处 理 ) To include material availability as an input. ( 材 料到位情况的输入 )
4
(3) Overtime Optimization Overtime – Currently this is an input by the user but we are in the process of changing it to be one of the optimized variables. – The algorithm will only propose overtime for machines being utilized in the current month. – Things to consider: Constraints on overtime: Total amount of overtime allowed in a month? What days do we add the suggest overtime to? Suggest overtime only for critical machines.
5
(4) Batch Size Optimization Similar to the overtime, this will also be an optimized value. The optimized batch sizes will be multiples of 6. We plan to implement this by keep a track of the amount of parts completed in each work order (Ex. 7 and 8). Once the total parts reach a certain threshold value we will then begin the production of the next work order (11 in this scenario).