3
Profile Need Objectives Features System work flow Expected outcome Implementation Conclusion
4
IDP: Production planning – Scheduling and Simulation software Platform: java Database tool: MySQL Duration: 10 months Company: Jagdish, PRECISION CASTING PVT. LTD. (Sapar-Veraval) Internal guide: Ass. Prof. Rachit Adhvarya Intro duction: Project would deal with the scheduling of all the on going processes of the company with best resource fit using mining technology.
5
Existing system Inventory management No system for scheduling Problem while scheduling manually Estimated time -> not precise Resource utilization may not efficient High failure rate Work load (time & paper) Need experienced employee
6
Better utilization of resources. Precise forecasting of completion time. Keeping eye on schedule remotely.
7
Precise decision for scheduling Resource utilization Fault tolerant Reduce overhead Learning from past Remote access
8
Get order information Check for available resources Allocate resource Avail? Calculate optimization Update DB Send to pending optimi zed? Represent pictorially NO YES
9
Standardized decision Minimised failure rate Best fit resource utilization Precise estimation
13
Class for Database connectivity. Class for process scheduling. Class to read and write excel file.
14
Project would fulfill all the objective. Successfully schedule and simulate the processes. Accuracy should be obtained due to use of past data.