Download presentation
Presentation is loading. Please wait.
Published byAmber Harrell Modified over 9 years ago
1
JIT and Lean Operations McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
2
You should be able to: 1. Explain what is meant by the term lean operations system 2. List each of the goals of a lean system and explain its importance 3. List and briefly describe the building blocks of lean 4. List the benefits of a lean system 5. Outline the considerations important in converting a traditional mode of operations to a lean system 6. Point out some of the obstacles that might be encountered when converting to a lean system 7. Describe value stream mapping Student Slides 14-2
3
Lean operation A flexible system of operation that uses considerably less resources than a traditional system Tend to achieve Greater productivity Lower costs Shorter cycle times Higher quality Student Slides 14-3
4
The ultimate goal: Achieve a system that matches supply to customer demand in a smooth uninterrupted flow A balanced system One that achieves a smooth, rapid flow of materials and/or work through the system 14-4 Student Slides
5
14-5
6
The lean’s ultimate goal is achieved by its supporting goals: 1. Eliminate disruptions 2. Make the system flexible 3. Eliminate waste, especially excess inventory Student Slides 14-6
7
Product design Process design Personnel/organizational elements Manufacturing planning and control Student Slides 14-7
8
Five personnel/organizational elements important to lean systems: Workers as assets Cross-trained workers Continuous improvement Cost accounting Leadership/project management Student Slides 14-8
9
Seven elements of manufacturing planning and control (MPC) are particularly important for lean system: 1. Level loading 2. Pull systems 3. Visual systems 4. Limited work-in-process (WIP) 5. Close vendor relationships 6. Reduced transaction processing 7. Preventive maintenance and housekeeping 14-9 Student Slides
10
Push system Work is pushed to the next station as it is completed Pull system A workstation pulls output from the preceding workstation as it is needed Output of the final operation is pulled by customer demand or the master schedule Pull systems are not appropriate for all operations Large variations in volume, product mix, or product design will undermine the system 14-10 Student Slides
11
Kanban Card or other device that communicates demand for work or materials from the preceding station Kanban is the Japanese word meaning “signal” or “visible record” Paperless production control system Authority to pull, or produce, comes from a downstream process. Two main types of kanbans: 1. Production kanban (p-kanban): signals the need to produce parts 2. Conveyance kanban (c-kanban): signals the need to deliver parts to the next work center. 14-11 Student Slides
12
Ideal number of kanban cards 14-12 Student Slides
13
1. Make sure top management is committed and that they know what will be required 2. Decide which parts will need the most effort to convert 3. Obtain support and cooperation of workers 4. Begin by trying to reduce setup times while maintaining the current system 5. Gradually convert operations, begin at the end and work backwards 6. Convert suppliers to JIT 7. Prepare for obstacles 14-13 Student Slides
14
1. Management may not be fully committed or willing to devote the necessary resources to conversion 2. Workers/management may not be cooperative 3. It can be difficult to change the organizational culture to one consistent with the lean philosophy 4. Suppliers may resist Student Slides 14-14
15
Be careful to study the requirements and benefits of lean systems before making a decision to convert operations Evaluate strengths and weaknesses of current operations The decision to convert can be sequential Weigh the pros and cons of a lean approach to inventories Supplier management is critical to a lean operation Student Slides 14-15
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.