Download presentation
Presentation is loading. Please wait.
Published byKevin Hodge Modified over 9 years ago
1
June 23, 2005R. Garoby Introduction SPL+PDAC example Elements of comparison Linacs / Synchrotrons LINAC-BASED PROTON DRIVER
2
23/06/2005R.G.2 Introduction All proton driver begin with a linear accelerator. In a Linac-based driver, all acceleration is done in the Linac. However a fixed energy synchrotron is still needed for accumulation and bunch compression. At low energy, it makes sense to only accelerate in a linac. Progress in sc resonators are reducing cost. However, at high energy (>5-8 GeV ?), a linac will anyhow be too costly. What is the limit energy for selecting acceleration in the synchrotron ? Other arguments ?
3
23/06/2005R.G.3 SPL & PDAC [1/3] Ion speciesH-H- Kinetic energy3.5GeV Mean current during the pulse40 (30 ?)mA Mean beam power4MW Pulse repetition rate50Hz Pulse duration0.57 (0.76 ?)ms Bunch frequency352.2MHz Duty cycle during the pulse62 (5/8)% rms transverse emittances0.4 mm mrad Longitudinal rms emittance0.3 deg MeV SPL (CDR2) characteristics
4
23/06/2005R.G.4 SPL main goals: - increase the performance of the CERN high energy accelerators (PS, SPS & LHC) - address the needs of future experiments with neutrinos and radio-active ion beams The present R&D programme concentrates on low-energy (Linac4) items, wherever possible in collaboration with other laboratories. SPL & PDAC [2/3]
5
23/06/2005R.G.5 [Extrapolation from PDAC based on the SPL CDR-1] Mean beam power4MW Kinetic energy3.5GeV Pulse repetition rate50Hz Pulse duration1.66 ss RF frequency44.02MHz Number of bunches (buckets)68 (73) Number of protons per pulse (per bunch)1.43 E14 (2.1 E12) Number of turns for injection345 rms normalized transverse emittances50 mm mrad Longitudinal emittance0.2eVs SPL & PDAC [3/3] SPL (CDR2) + PDAC characteristics
6
23/06/2005R.G.6 Elements of comparison [1/2] DomainIssue of interestQuestion PhysicsFit to the requirements for the secondary beam Specifications Synergy with other physics needsIdentification & specs. Upgrade potentialIdentify Time to full performance / riskEstimate EconomicsGlobal economical optimum at construction Cost as a function of energy & rate at fixed beam power Minimal cost of exploitation (electricity, radioprotection, maintenance) Power efficiency Reliability Maintenance needs Radioprotection issues ManagementPossibility of a staged implementationStudy possibilities Share the efforts with other teams working for other goals List of possibilities Exploit/enrich available competenceList
7
23/06/2005R.G.7 DomainIssue of interestLinacSynchrotrons Physics Fit to the requirements for the secondary beam < 8 GeV Shorter bunch distance Cycling rate (adjacent bursts ?) Higher energy Larger bunch distance Cycling rate ~ 10 Hz >15 GeV Synergy with other physics needsRIBs + injector for HEP~ injector for HEP Upgrade potentialLarge (power, users)Small Time to full performance / riskModerate/small? Economics Global economical optimum at construction To be studied Minimal cost of exploitation (electricity, radioprotection, maintenance) To be studied Management Possibility of a staged implementation Yes (energy, power)? Share the efforts with other teams working for other goals Yes (ADS, ILC, …)? Exploit/enrich available competence To be studied Elements of comparison [2/2]
8
23/06/2005R.G.8 To be continued …
9
23/06/2005R.G.9 ANNEX
10
23/06/2005R.G.10 Cost comparison Energy Cost
11
23/06/2005R.G.11 SPL - CDR2 baseline RF 704 MHz bulk Niobium cavities 3 families of cavities : beta =0.5,0.85,1.0 gradients : 15, 18, 30 MV/m 5, 6 and 7 cells per cavity Cold (2K) quadrupoles in the cryomodules, independently aligned from the cavities (to minimize cold/warm transitions and maximize real estate gradient). Cryomodules of maximum length (between 10 and 15 m), containing n cavities and (n+1) quadrupoles. Diagnostics, steering etc. between cryomodules. Length of the cavities limited by fabrication and handling considerations. Proposed number of cells per cavity is therefore 5, 6 and 7 for the three sections. 2 MW max power /coupler Standardisation of the design after 2 GeV
12
23/06/2005R.G.12 HIP WG: long term alternatives Present accelerator Replacement accelerator Improvement INTEREST FOR LHC upgrade physics beyond CNGS RIB beyond ISOLDE Physics with k and Linac2Linac4 50 160 MeV H + H - +0 (if alone) PSB 2.2 GeV RCS* for HEP 1.4 2.2 GeV 10 250 kW +0 (if alone)+ 2.2 GeV/mMW RCS* 1.4 2.2 GeV 0.01 4 MW + ++ (super-beam, -beam ?, factory) + (too short beam pulse) 0 (if alone) 2.2 GeV/50 Hz SPL* 1.4 2.2 GeV 0.01 4 MW + +++ (super-beam, - beam, factory) +++0 (if alone) PS SC PS*/** for HEP 26 50 GeV Intensity x 2 ++0 (if alone)0+ 5 Hz RCS*/** 26 50 GeV 0.1 4 MW ++ ( factory) 0+++ SPS1 TeV SC SPS*/** 0.45 1 TeV Intensity x 2 +++?0 * with brightness x2** need new injector(s) <-
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.