1 Texas Transportation Commission Presentation Scott McLaughlin, CRRMA Chair October 25, 2012

2 CAMINO REAL REGIONAL MOBILITY AUTHORITY The CRRMA is focused on advancing the El Paso region’s transportation system through its involvement in: Project Financing Project Management Project Design Toll Operations New TRZ Projects

3 PROJECT FINANCING State Spur 601 (Inner Loop) – Liberty Expressway Inaugural CRRMA Bond Issuance of $233,355,000 7.4 mile connection between the Patriot (US54) and Purple Heart (LP375) Freeways First bond issuance supported solely by pass-through proceeds

4 PROJECT FINANCING Zaragoza Direct Connectors TxDOT design and construction CRRMA SIB Loan of up to $20,000,000 for construction SIB Repayment Source – El Paso Transportation Reinvestment Zone No. 2 (pledged to CRRMA)

5 PROJECT FINANCING Transmountain NE TxDOT design and construction CRRMA SIB Loan of up to $6,000,000 for City-Requested Aesthetics & Cost Overruns SIB Repayment Source – El Paso Transportation Reinvestment Zone No. 2 (pledged to CRRMA)

6 PROJECT MANAGEMENT Americas Interchange CDA Design/Build Project - 3 DCs & associated Improvements Total Project Cost - $141,000,000 – ARRA ($96M), CBI ($15M) & SIB Loan/Build America Bonds ($30M) On Schedule for January 2013 Substantial Completion CRRMA is managing the Project

7 PROJECT MANAGEMENT I-10 Aesthetics Total Project Cost - $10,000,000 Partnership with TxDOT and City of El Paso to improve I-10 Corridor Nationally recognized artist paired with El Paso artist for development of aesthetic improvements CRRMA is managing the Project

8 PROJECT DESIGN Americas Interchange All remaining design work being provided by the CRRMA: Westbound Northbound DC Westbound Southbound DC Eastbound Southbound DC Northbound Eastbound DC Southbound Eastbound DC Cloverleaf & Frontage Road

9 PROJECT DESIGN Spur 1966 Connection between Schuster and Paisano Dr. (US85), near UTEP Coordination between TxDOT, UTEP and City of El Paso Total Project Cost - $48,700,000 (estimated)

10 TOLL OPERATIONS César Chávez Managed Lanes TxDOT design and construction 9 miles of managed lanes (electronic toll collection) CRRMA negotiating with systems integrator for opening in late 2013 First segment of the Southern Relief Route (alternative to I-10)

11 TOLL OPERATIONS Remaining Segments of the Southern Relief Route Americas Managed Lanes – CRRMA is in the procurement process for preliminary engineering and environmental services I-10 Managed Lanes – CRRMA has requested toll equity funding to pursue preliminary engineering and environmental services Border Highway West – CRRMA is coordinating with TxDOT as it seeks environmental approval

12 TRANSPORTATION REINVESTMENT ZONES New TRZ Projects The CRRMA is assisting El Paso County, the Town of Horizon City and the City of Socorro to create three new TRZs to develop a revenue stream that the CRRMA will use to design and construct approximately $70M worth of transportation projects.

13 PROPOSED TRZ - EL PASO COUNTY RoadwayProject Limits RojasFrom: El Paso City Limits To: Eastlake Blvd. Eastlake Blvd. From: I-10 To: Berryville St. Arterial 1From: Pellicano To: Paseo del Este Berryville/ Darrington From: Paseo del Este To: Colonia Revolucion PellicanoFrom: Berryville/Darrington To: Arterial 1 Greg/ Edgemere From: El Paso City limits To: Vista del Este 1-mile width (1/2 mile from centerline)

14 PROPOSED TRZ - TOWN OF HORIZON CITY RoadwayProject Limits Eastlake Blvd. From: Darrington To: Horizon Blvd. Proposed Horizon City TRZ 1-mile width (1/2 mile from centerline)

15 PROPOSED TRZ - CITY OF SOCORRO RoadwayProject Limits Old Hueco Tanks Rd. From: North Loop Dr. (FM 76) To: Alameda Ave. (HW 20) Proposed City of Socorro TRZ 1-mile width (1/2 mile from centerline)

16 THE FUTURE OF THE CRRMA Southern Relief Route Toll Facilities – develop/operate the Americas Managed Lanes, LP375 César Chávez Managed Lanes, LP375 Border Highway West and I-10 Managed Lanes Projects International Bridges – continue discussions with the City of El Paso regarding the management of the City’s international crossings Parking Facilities – continue discussions with private and public entities regarding the design/construction/operation of proposed parking facilities

17 QUESTIONS? Camino Real Regional Mobility Authority 2 Civic Center Plaza, 9 th Floor El Paso, Texas 79902 (915) 541-4986 info@crrma.org www.crrma.org