Download presentation
Presentation is loading. Please wait.
Published byAleesha Garrett Modified over 9 years ago
1
US 101 Corridor Mobility Master Plan Agenda Item B-5 San Luis Obispo Council of Governments Board Meeting October 2, 2013- US 101 Corridor Mobility Master Plan
2
2 Outreach 187 comments on interactive web tool 14 presentations at councils and advisory bodies 29 people attended 3 workshops 203 intercept interviews at 3 locations Technical Analysis Top Tier performance measures chosen to evaluate 70 miles 3 Task Force Meetings 3 Focus study segments chosen Next Steps Technical Analysis underway Next round of workshops late 2013 or early 2014 Draft Plan in Spring 2014 US 101 CORRIDOR MOBILITY MASTER PLAN WWW.SLOCOGCONNECTINGCOMMUNITIES.COM October 2, 2013 – Item B-5
3
3 US 101 CORRIDOR MOBILITY MASTER PLAN WWW.SLOCOGCONNECTINGCOMMUNITIES.COM October 2, 2013 – Item B-5
4
PUBLIC INVOLVEMENT
6
PERFORMANCE MEASUREMENT
8
TASK FORCE FOCUS STUDY SEGMENTS
9
2035 PERFORMANCE MEASURES
10
FOCUS SEGMENT RECOMMENDATION
11
Add to technical analysis based on model results Remove from technical analysis Include in technical analysis
12
12 Recommendation Recommendation: Study Task Force: TTAC: CTAC: 1.Receive status update 2.Endorse Technical Study Segments 3.Conditionally endorse fourth study segment Concur with Technical Study Segments Support staff recommendations October 2, 2013- US 101 Corridor Mobility Master Plan
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.